What is more, the new structure can simplify construction steps and shorten construction period taking advantage of mechanical operation.
另外,采用该结构形式能简化施工工序,便于机械化施工,从而极大地缩短施工工期。
Chapter 4 presents construction steps and methods of flexible channel structure.
第四章介绍了弹性渠道结构构建步骤及方法。
Based on these, a 3d elastoplastic model is established to study the whole interaction among pile, soil and tunnel in the cohesive foundation with actual tunnel construction steps.
在此基础上建立三维弹塑性模型,模拟实际的施工过程,从整体上研究黏性土地基中桩—土—隧道三者间的作用特征。
Based on these, a 3d elastoplastic model is established to study the whole interaction among pile, soil and tunnel in the cohesive foundation with actual tunnel construction steps.
在此基础上建立三维弹塑性模型,模拟实际的施工过程,从整体上研究黏性土地基中桩—土—隧道三者间的作用特征。
应用推荐