• The Contractor shall commence the construction after the construction Permit gained.

    该工程获得开工证后承包商方能开始动工。

    youdao

  • He complained that there is so much red tape involved in obtaining a construction permit.

    他埋怨要得到建筑许可证需经过许多关卡。

    youdao

  • Available variation to the standard materials of construction permit diversified applications.

    标准结构材料可以根据具体应用进行更换。

    youdao

  • So most reactors obviously are going to 1 0 3 licenses and then you have this construction permit process.

    所以,大多数的反应堆都是要用103许可证的,然后,你会得到这个建设许可的过程。

    youdao

  • Article 9 the project owner shall have construction commenced within three months from the day it receives the construction permit.

    第九条建设单位应当自领取施工许可证之日起三个月内开工。

    youdao

  • For all that the "licence Raj" was supposedly scrapped two decades ago, it can still take nearly 200 days to get a construction permit and seven years to close a business.

    尽管据说是二十年前就废止了“许可证制度”,但至今仍要花上近200天才能拿到施工许可,以及花七年的时间来关闭一家企业。

    youdao

  • According to reports by the Indonesian media, China's joint project to build a high-speed railway in Indonesia has been suspended as the construction permit is yet to be issued.

    据印尼媒体报道,中国承建的印尼高铁项目因未获得施工许可证而被迫暂停。

    youdao

  • Where construction of a project is not commenced and no application is made for postponement or the period for postponement expires, the construction permit shall be automatically invalid.

    既不开工又不申请延期或者超过延期时限的,施工许可证自行废止。

    youdao

  • The competent administrative department for construction shall, within 15 days from the day it receives the application, issue the construction permit to the applicant that meets the conditions.

    建设行政主管部门应当自收到申请之日起十五日内,对符合条件的申请颁发施工许可证。

    youdao

  • The effective period of a Network Construction Permit for various categories of Fixed Network Telecommunications Business shall not be longer than the effective period of the Establishment Approval;

    各类固定通信业务之网路建设许可证有效期间,不得超过筹设同意书之有效期间;

    youdao

  • A valid Construction Noise permit issued by the Environmental Protection Department is required for the carrying out of percussive piling during the permitted hours.

    如须于核准时间内进行撞击式打桩工程,必须事先取得由环保署签发的建筑噪音许可证。

    youdao

  • The developing unit or individual may go through the examination and approval formalities for land use only after it or he obtains the permit for planned rural construction.

    建设单位或者个人在取得乡村建设规划许可证后,方可办理用地审批手续。

    youdao

  • The clients specifically wished for a design that would permit them to supervise the entire construction of the house themselves.

    客户希望有一个专门的设计,将允许他们来监督自己的房子整个建筑。

    youdao

  • After cable duct construction, the Permit Holder shall reinstate the affected stream bed of Ho Chung River to its original conditions using natural substratum.

    在电缆管道建成后,许可证持有人须用天然底土修复受影响的蚝涌溪流河床,使其回复原貌。

    youdao

  • Location advantage, market demand, convenient traffic and construction plan permit.

    区位优势,市场需求,交通方便,规划许可。

    youdao

  • The Permit for port Operation may not, according to law, be granted to any wharf that does not conform to the overall planning and construction of a port.

    对不符合港口总体规划建设的码头,依法不得给予港口经营许可。

    youdao

  • The planning permit is obtained for construction of the project in the urban planning zone;

    在城市规划区的建筑工程,已经取得规划许可证;

    youdao

  • If this permit is cancelled or surrendered during construction or operation of the Project, another environmental permit must be obtained under the Ordinance before the Project could be continued.

    如果本许可证在工程项目建造或营办期间被取消或交回,则在继续进行工程项目之前,必须先根据条例规定取得另一份环境许可证。

    youdao

  • Administration: Records shall be maintained for all vehicles entering the construction site without (permanent) vehicle entry permit.

    日常管理:对于那些不必使用(永久性)通行证进入现场的各种车辆,必须保存好它们的有关记录。

    youdao

  • The wholesale construction of new transmission corridors is not always the best option due to a combination of environmental, land-use, permit-granting and cost considerations.

    新的输电走廊的大规模建设往往不是最佳的选择,因为要综合考虑环境、占地、审批和造价等因素。

    youdao

  • Article 26 the permit issued by a municipal or county (city) (bureau) competent authority of construction under this Code only means the permission of the claimed construction, use or demolition.

    第26条直辖市、县(市)(局)主管建筑机关依本法规定核发之执照,仅为对申请建造、使用或拆除之许可。

    youdao

  • This paper describes the hybrid-construction PCB were fabricated by the FR-4 laminate and high performance low-loss prepreg to achieve lower signal crosstalk and permit lower cost.

    综述了采用低成本的常规FR - 4层压板芯材和低介电常数高性能的半固化片形成的混合结构印制板,它具有较低的信号串扰和较低的成本。

    youdao

  • This paper describes the hybrid-construction PCB were fabricated by the FR-4 laminate and high performance low-loss prepreg to achieve lower signal crosstalk and permit lower cost.

    综述了采用低成本的常规FR - 4层压板芯材和低介电常数高性能的半固化片形成的混合结构印制板,它具有较低的信号串扰和较低的成本。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定