The improved algorithm is applied into one kind of combinational optimization problem of construction order for underground house groups.
把改进算法应用于地下工程中的一类组合优化问题——硐群施工顺序优化。
The result shows that on matter which construction order is adopted, the midwall will always slant to the side of shallower depth of cover.
结果表明:不管采用哪一种施工顺序,中墙均受偏压荷载的作用并向埋深较浅侧倾斜。
The result shows that on matter which construction order is adopted, the midwall will always slant to the side of shallower depth of cover.
结果表明:不管采用哪一种施工顺序,中墙均受偏压荷载的作用并向埋深较浅侧倾斜。
应用推荐