The construction based on old salt cavern can not only shorten the construction cycle, but also reduce the construction cost.
利用老溶腔不但可以缩短建库时间,还可以减少盐穴储气库的建设成本。
The plates can be installed from lower floors to upper floors. Installation can be simultaneously carried out with civil engineering, which is conducive to shorten the overall construction cycle.
从楼层下方向上方安装,能够和土建配合同步施工,有利于缩短整体建筑施工周期。
The plates can be installed from lower floors to upper floors. Installation can be simultaneously carried out with civil engineering, which is conducive to shorten the overall construction cycle.
从楼层下方向上方安装,能够和土建配合同步施工,有利于缩短整体建筑施工周期。
应用推荐