Period End Dates are used to determine the Calculation Period for which a Fixed Amount is payable.
周期结束日期是用于确定计算期间的一个固定数额支付。
The Day Count Fraction is used to determine the number of days in the Calculation Period for which a Fixed Amount is payable.
日计数分数是用来确定一个固定数额支付的计算期间的天数。
The objective function of the optimization is the saving present value per unit heat consumption during the calculation period.
目标函数为计算期内单位供热量的节约额现值。
If your first cash flow occurs at the beginning of the first period, the first value must be added to the NPV result, not be included in the NPV calculation.
如果第一个现金流出现在第一期的开始,则第一个值必须加到NPV结果中,而不是包含在NPV计算中。
When a time period is prescribed in days, months and years, the day on which the period begins shall not be counted as within the period; calculation shall begin on the next day.
规定按照日、月、年计算期间的,开始的当天不算入,从下一天开始计算。
This paper studies and puts forward the feedback analysis method of operation and control loads of the dam with slot during operation period and derives its calculation control load formula.
研究并提出了带缝混凝土坝运行期的馈控运行荷载的方法,推导了其计算控制荷载的公式,研制了相应的分析程序。
This feature can help you to facilitate the calculation of your menstrual period!
这个功能可以帮你方便的计算你的生理周期!
The maximum amount guarantee is a special one with a special calculation of its guarantee period.
最高额保证是一种特殊的保证,其保证期间的确定也有其特殊性。
Although not a cash cost, depreciation or amortization is typically included in the calculation of EVA as an economic cost for the use of the asset during the period.
虽然折旧或摊销不是现金的支出,但它在EVA的计算中是一种在某一时期内使用某资产的典型的经济成本。
When a time period is prescribed in hours, calculation of the period.
听证所需时间不计算在前款规定的期限内。
Hearing at the time required for the calculation of the period stipulated in the preceding paragraph.
听证所需时间不计算在前款规定的期限内。
This method can mostly satisfy the customers' requirements and make the calculation of product costing and period easy.
该系统的特点是既可以保证顾客对所采用的产品配置方案满意度最大,又便于产品产品和生产周期的计算。
Application of analysis about costs of life period in equipment evaluation and calculation of benefit in renewal of equipment were discussed.
在此基础上探讨了寿命周期费用分析在设备评价和设备更新效益计算中的应用方法。
The calculation methods of its shimmy period in small and large angle are presented.
介绍了三线摆微角度与大角度摆动周期的计算方法。
This program can make designing calculation, selecting components and drawing into one and shorten its designing period, lighten work strength.
该程序实现了设计计算、部件选型和绘制图纸的一体化,并可缩短设计周期,减轻工作强度。
The integral period sampling, which is realized by realtime frequency calculation and voltage capture function of IC chip, is necessary for precise digital signal processing.
借助芯片的捕获功能,计算信号的实时频率,实现了整周期采样,保证了数字信号处理的精度。
In order to solve the problem about the reactor period calibrating instrument, a new software signal source based on numerical calculation is presented.
为了解决反应堆周期校验仪存在的问题,提出一种基于数值计算的软件信号源。
The extra cost questions caused by the time delay arouse by the objective factor, the cost calculation methods and period of validity of delay time.
客观原因造成工期延误的费用赔偿问题,费用计算的方法,工期延误有效期的确定。
It can be seen that the frequency curve calculation is basically reasonable and show the estimation of "1482 flood" return period is rational after putting palaeofloods into flood series.
把古洪水加入到洪水系列后进行频率计算,可以看出频率曲线基本合理,说明对1482年洪水重现期的判断是合理的。
The structure principle of three line pendulum is outlined, and the calculation methods of its shimmy period in small and large Angle are presented.
叙述了三线摆的结构原理,介绍了该摆小角与大角摆动周期的计算方法。
A calculation for period of a single freedom nonlinear conservative system vibrating in a large amplitude is performed, and the period formulae of some typical vibration problems are presented.
简要介绍了单自由度非线性保守系统作大振幅振动时周期的计算方法,并给出了几个常见典型振动问题的周期公式。
This thesis discusses period analysis methods of hydrological time series, and compares them from theory, measured sample calculation and Monte-Ca.
本文从理论基础、实测样本计算和统计试验方法三个方面对水文时间序列的周期分析检测方法进行了分析研究。
From theoretically, the influence of the angular amplitude of simple pendulum on its period is analyzed, and the accurate calculation formula of the simple pendulum period are given.
从理论上分析了单摆的角振幅对其周期的影响,并给出了单摆周期的精确计算公式。
The arrangements and calculation of the guarantee period of the maximum guarantee follow the rule of the guarantee period of general guarantee.
最高额保证中保证期间的约定与计算亦应遵循普通保证中的相关规则。
Moreover, the calculation process of the theoretical natural heave period was analyzed, and the influence on the heave motion of the caisson with different drafts was studied.
同时,分析了理论垂荡固有周期值的计算过程,并研究了不同吃水对气浮沉箱垂荡运动特性的影响。
The period values of different sequences from different initial values in double bytes were gotten through discrete digital chaos calculation.
采用混沌的数字计算法计算了双字节不同初始值的周期。
When a time period is prescribed in hours, calculation of the period shall begin on the prescribed hour.
规定按照小时计算期间的,从规定时开始计算。规定按照日、月、年计算期间的,开始的当天不算入,从下一天开始计算。
According to the accelerated failure model, the assessment method of reliability and calculation method of life period of OCSH were illustrated with example.
依据加速失效模型举例说明了OCSH的可靠性评估和寿命计算方法。
According to the accelerated failure model, the assessment method of reliability and calculation method of life period of OCSH were illustrated with example.
依据加速失效模型举例说明了OCSH的可靠性评估和寿命计算方法。
应用推荐