• In office calculation of closed traverse, the Angle of connection is not corrected, because there is no check condition.

    在闭合导线内业计算中,由于连接角没有检核条件,因而对连接角未进行改正。

    youdao

  • The article studies the sub-hydraulic lifting scaffold in high-rise building design, calculation and application, and to pay for a flight in the Office building Project as an example to elaborate.

    本文主要研究了分体液压升降爬架在高层建筑工程中的设计、计算与应用,并以中交一航局办公大楼工程为例进行阐述。

    youdao

  • Introduced the method for analysis and calculation of coaction between raft foundation, piles and ground for an expressway office, it is useful for reference of the same project.

    介绍某高速公路管理处考虑筏板-桩-地基共同作用的分析与计算方法,以供类似工程参考。

    youdao

  • Therefore, the key to the realization of office automation in house property surveying management is a good sharing area apportion calculation model.

    因此,一个好的公用建筑面积分摊计算模型是房产测绘管理实现办公自动化的关键所在。

    youdao

  • Based on annual cooling load calculation of a certain building, the relationship between envelop isolation characteristic and air-conditioning energy consumption of an office building is discussed.

    通过对一特定建筑物进行全年空调负荷的计算,讨论和分析办公建筑围护结构保温性能与空调能耗的关系。

    youdao

  • Provide office project preliminary study, Marketing planning and other consultants; Responsible for the Financial calculation; Assist in writing project planning reports.

    提供写字楼项目前期研究、营销策划等咨询顾问;负责财务测算;协助撰写项目策划报告。

    youdao

  • Based on the CFD method, 3d numerical calculation was used to simulate the airflows at different blow angles in the air-conditioned office.

    采用CFD方法对空调办公室内不同送风角度下气流组织进行三维数值模拟计算。

    youdao

  • Strata thickness calculation is a routine work in office operation and geological analysis after field operations, while the traditional calculation may spend geologists a lot of time and strength.

    岩层厚度的计算是野外地质工作内业整理和地质分析中的一项经常性工作,传统的工作方法往往要花费地质人员大量的时间和精力。

    youdao

  • Based on an engineering example of office building in hot summer and cold winter region, using the method of calculating, energy-saving design of roof insulation calculation is made in this paper.

    通过一个夏热冬冷地区办公建筑的工程实例,采用节能计算的方法对其屋顶的保温隔热构造进行节能设计。

    youdao

  • Based on an engineering example of office building in hot summer and cold winter region, using the method of calculating, energy-saving design of roof insulation calculation is made in this paper.

    通过一个夏热冬冷地区办公建筑的工程实例,采用节能计算的方法对其屋顶的保温隔热构造进行节能设计。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定