• Save the page, and build the project.

    保存页面然后创建项目

    youdao

  • Build the project EAR file.

    构建项目EAR文件

    youdao

  • Click Finish to build the project.

    单击Finish构建项目

    youdao

  • Apache Ant was used to build the project.

    ApacheAnt用来构建工程

    youdao

  • Build the project.

    构建这个项目

    youdao

  • How to build the project, specified in the element?

    如何构建项目元素指定

    youdao

  • From the project menu, select Rebuild All to build the project.

    Project菜单选择RebuildAll构建项目

    youdao

  • You don't need to build the project if the source code hasn't changed.

    如果源代码没有变化需要构建

    youdao

  • Thus, the more pages you create, the more time it takes to build the project.

    因此创建页面越多构建项目时间会越

    youdao

  • Now we need to import, build the project interchange, and deploy it on the server.

    下面我们需要导入构建项目交换在服务器对其进行部署

    youdao

  • Specifies whether or not to include in the batch build the project configuration specified.

    指定生成是否包含指定项目配置

    youdao

  • If many files have properties that were modified, the time to build the project will increase.

    如果许多文件修改属性生成项目时间增加

    youdao

  • You can build the project, export it as a WAR file, and deploy it to the Lotus Workplace server.

    可以构建项目,将该项目导出WAR文件部署LotusWorkplace服务器上。

    youdao

  • Build output path, type the path where you want the schema file to be created when you build the project.

    生成输出路径”中,键入在生成项目创建架构文件路径

    youdao

  • Build output file name, type the name that you want to give the compiled schema file when you build the project.

    生成输出文件名”中,键入在生成项目给予经过编译的架构文件名称

    youdao

  • Now set up your environment variables on the machine on which you want to build the project, as shown in Listing 4.

    现在希望编译项目机器设置环境变量如清单4

    youdao

  • File will look very similar, other than the details of which tools to use to build the project. You can maintain the config.xml.

    正如所料,config.xml文件中的项目看起来非常相似,不同之处只是哪个工具构建项目细节

    youdao

  • If you build the project after you've made changes in the deployment descriptor, the artifacts are overwritten with the defaults.

    如果部署描述符做出更改之后构建项目,则构件缺省构件覆盖。

    youdao

  • This build script is called by CruiseControl whenever it detects a change and needs to build the project. When the build runs, it will

    每当检测更改并且需要构建项目CruiseControl调用构建脚本

    youdao

  • You can download Pivot 1.3 as binaries or source; the source distribution contains a build file that describes how to build the project.

    可以下载二进制文件源代码形式的Pivot 1.3;源代码发行版包含一个BUILD文件,它描述如何构建项目

    youdao

  • When you build the project, this command will change the minimum operating system version in the application manifest to 5.1.2600.0.

    生成项目命令会将应用程序清单中的操作系统最低版本更改5.1.2600.0。

    youdao

  • Three elements with the localworkingcopy attribute point to the local copy of the CVS modules that are required to build the project.

    三个localworkingcopy属性元素指向构建项目必需的CVS模块本地副本

    youdao

  • To run this test, I'll need to build the project, open the generated assembly in the NUnit application, and then click the run button.

    运行测试需要生成项目NUnit应用程序打开生成程序集然后单击Run按钮

    youdao

  • In addition, you can specify this target either by its name or by a variable that is replaced by the appropriate value when you build the project.

    此外可以名称或是置专案时会适当取代变数指定目标

    youdao

  • Basically, you copy this file to a new file called build.properties, make changes specific to your environment, and then use Ant to build the project.

    大体上文件复制为名build . properties的文件,对特定环境的部分进行更改然后使用Ant构建项目。

    youdao

  • In this scenario, the type information for the PIA types that are used by your solution is embedded into the solution assembly when you build the project.

    方案中,解决方案使用pia类型类型信息会在生成项目嵌入到解决方案程序集中

    youdao

  • Use the wizard to specify the details of the existing code files that will be added to the project and the application that will be created when you build the project.

    通过向导可以指定将要添加项目中的现有代码文件详细信息,以及生成项目将要创建应用程序的详细信息。

    youdao

  • Trained project managers usually follow an entire methodology to build the project structure, including understanding the business value, milestones and tasks, resource allocation, and so on.

    经过培训项目经理通常按照一套完整方法构建项目结构包括了解业务价值里程碑任务资源分配

    youdao

  • Trained project managers usually follow an entire methodology to build the project structure, including understanding the business value, milestones and tasks, resource allocation, and so on.

    经过培训项目经理通常按照一套完整方法构建项目结构包括了解业务价值里程碑任务资源分配

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定