• 上海市中环线许路北虹下立交工程目前世界上饱和含水软土地层施工截面最大的管幕法工程。

    The subway crossing project through Hongxu Road in Shanghai is the pipe-roof project with the biggest cross-section box culvert up to now in the world.

    youdao

  • 上海地区隧道处于饱和含水土地施工方法法为主

    Tunnels in Shanghai area sit mostly on soft soil stratum saturated and shield tunneling is the construction method commonly used.

    youdao

  • 南京地铁西线位于长江漫滩饱和软地层地铁施工完成隧道结构出现较大沉降差异沉降。

    Obvious and different settlements happened in the west extension of the subway that is located in the stratum of Yangtze River valley flat after the construction of the subway tunneling.

    youdao

  • 南京地铁西线位于长江漫滩饱和软地层地铁施工完成隧道结构出现较大沉降差异沉降。

    Obvious and different settlements happened in the west extension of the subway that is located in the stratum of Yangtze River valley flat after the construction of the subway tunneling.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定