资源约束项目调度问题是项目进度管理中的典型问题。
Resource-constrained project scheduling problem is a typical issue in project scheduling management.
建立了研发项目多执行模式随机资源约束项目调度问题模型。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
在资源受限的项目调度过程中存在着资源冲突问题,严重影响着项目活动的执行。
There is resources conflict problem in the process of resource-constrained project scheduling, which seriously affects the execution of project activity.
调度平台用PDPEL对各类型节点和连接弧的形式化描述,以便工作流引擎进行项目调度。
The scheduling platform describes all the nodes and connections by PDPEL, so that the workflow engine can schedule the activities.
研究了员工具有异质效率、最小化项目工期的项目调度问题,并建立了相应的整数线性规划模型。
Project scheduling with heterogeneous efficiency workforce to minimize project duration is considered, and the corresponding integer linear programming is presented.
与其他多项目调度启发式算法的比较和统计检验,说明随机抽样算法显著优于这些常用的启发式算法。
Comparison with other tested heuristics verifies that the proposed random sampling method is significantly superior to other heuristics for scheduling resource-constrained multiple projects.
本文以装甲车辆传动装置设计为例,研究产品设计资源受限项目调度规划方法和优化调度问题求解算法。
Taking transmission design of armored vehicles as an example, this dissertation does research on Resource-Constrained Project Scheduling Problem (RCPSP) for product design and the solving algorithms.
产品开发和生产是制造型企业运营的两个关键环节,产品开发项目调度和车间调度问题是这两个关键环节中的核心问题。
Production development and manufacturing are playing important parts in this process, and the problems of production development project scheduling and shop scheduling are the kernel of them.
计算结果显示了两种蚁群算法在求解多目标资源受限项目调度问题时的优势和对该类问题的适应性,同时也暴露了它们的一些缺陷。
The effectiveness and efficiency of these two algorithms are tested by comparing the results of solving Patterson's 110 problems with some priority based heuristics.
资源平衡优化问题即资源有限项目调度问题,是一个NP难问题,现在商用项目管理软件系统中的资源平衡优化问题多采用基于优先规则的启发式算法。
The resource-constrained project scheduling problem (RCPSP) is NP problem, most of commercial project management software usually employ simple priority rules for solving the problem.
这个项目的难点在于调度任务。
LotusWorkflow是一种应用程序,可以帮助组织计划、调度、跟踪、监控和存档基于文档的工作和项目。
Lotus Workflow is an application that allows your organization to plan, schedule, track, monitor, and archive its document-based work and projects.
众所周知的是,IBM是Linux开源社区的一个很重要的贡献者,已经贡献了很多项目,例如日志文件系统、调度程序,等等。
It is also well known that IBM is a strong contributor to the Linux open source community and has contributed features such as journaled file systems, schedulers and more.
幸运的是,类似LinSched(用户空间Linux调度器模拟器)的项目可以帮助您解决此问题。
Luckily, projects like LinSched (the User-space Linux Scheduler Simulator) can help solve this problem.
对于一个项目来说,管理人员创建工作计划、为“小组”召集开发人员并保持每个人都有任务、按调度进行并且开销在预算内。
For a software project, management creates work plans, recruits developers for the "team," and keeps everybody on task, on schedule, and on budget.
在项目浏览器中选择Portle调度描述符。
Select the portlet deployment descriptor icon in the Project explorer
它还具有项目计划,任务调度,任务监控等功能。
It should also be used for project planning, visualization and reporting tasks.
本文的研究工作结合辽宁省教育厅基金项目“露天矿卡车自动化实时调度决策支持系统”进行。
The research work is carried on and combined with Liaoning province Department of Education fund item "the truck automation real-time dispatch decision support system in surface mine".
我发现,在事件调度线程长时间需要的事件会导致我的项目工作缓慢。
I have found out that long time needed events in event dispatch thread can cause my project to work slowly.
从大物流工程项目类制造企业管理的角度,提出了基于企业生产计划的物流调度模型。
As viewed from the management of enterprise with large material flow engineering project, a scheduling model is presented based on the enterprise production plan.
其他设置依赖于你的环境和特定的需要。一旦你保存调度项目,你的任务将会按照调度开始它的第一次执行。
All of the other items are dependent upon your environment and specific needs. Once you save the record, your job will be scheduled to execute for the first time.
为此,希望各方进一步加强沟通,密切配合,科学调度,全力以赴,加快项目推进,确保按计划如期竣工,投入生产。
Therefore, we hope we can cooperate with each other very well in the future to push forward this project and ensure the project will be completed as schedule and start operation as soon as possible.
采用基于排列的方法和串行项目进度生成机制,结合多项目的任务列表,可以保证所得调度方案满足项目优先关系约束。
Combined with method based on order and serial schedule generation scheme and multi-project task list, the gotten scheduling scheme can meet the project schedule constraints of precedence relations.
调度自动化系统是电网监控的重要手段,其升级改造项目可行性研究是调度自动化系统建设质量的保证。
Grid dispatching automation system is an important means of monitoring network. Project feasibility study of dispatching automation system construction is the guarantee of quality.
本文以实际开发的自动化立体仓库项目为依托,针对自动化立体仓库调度中的一些问题开展了相应的研究工作,提出了一种合理的立体仓库调度策略。
The thesis does some research work on several problems related to scheduling of automated storage (SAS) and presents an efficient strategy on SAS based on the real SAS project.
铁路牵引供电远动系统项目就是基于整合沈阳铁路局管内现有的多个远动系统,实现统一的调度指挥而新开发的系统。
SCADA technology system for railway traction power supply is based on integration of many existing SCADA systems in Shenyang Railway Bureau and achieves unified command.
铁路牵引供电远动系统项目就是基于整合沈阳铁路局管内现有的多个远动系统,实现统一的调度指挥而新开发的系统。
SCADA technology system for railway traction power supply is based on integration of many existing SCADA systems in Shenyang Railway Bureau and achieves unified command.
应用推荐