下面的图1中显示了示例项目的文件树组织。
The file tree organization of the sample project is shown below in Figure 1.
客户将在不同阶段或项目时间范围内提供的可交付性的详细列表(例如组织图、数据、格式等等)。
A detailed list of deliverables the customer will provide (such as organization charts, data, formats, and so on) at different stages or timeframes of the project.
图3显示了在一个被控制项目管理的阶段中,其中的工作将如何被组织起来。
Figure 3 shows how work can be organized within a stage, with the stage governed by a control project.
图1也阐明了一个典型的规划管理组织,比一个项目的管理组织要更复杂。
Figure 1 also illustrates a typical program management structure, which is more complex than that of a project.
如果这个项目组织利用uml来建模,那么单元测试将需要序列图,类图,可能还会需要活动图。
If the project organization is using UML for modeling, unit testers will need sequence diagrams, class diagrams, and perhaps activity diagrams.
图8:用于确认及组织过程和项目数据的过多的材料。
Figure 8: a plethora of materials is used for identification and organizing of process and project data.
尽管RUP将项目管理列为其九个核心规程之一(参见下面的图2),但是使用RUP的组织仍旧得益于使用固定的项目管理框架。
Although RUP lists project management as one of its nine core disciplines (see Figure 2 below), organizations using RUP may still benefit from having an anchoring project management framework.
图3显示了一个组织的框架,嵌套的团队和能力的范围从项目级到公司级。如果评估仅仅处于项目级,我们在项目评估考虑它。
Figure 3 shows an organizational framework, with the scope of nested teams and capabilities expanding from project-level to corporate-level influence.
本示例中的代码被组织到三个Eclipse项目中,在图3和图4中可以看到。
The code in this example is organized into three Eclipse projects, visible in Figures 3 and 4.
明确项目决策者组织图。
初步选定的测量项目有四部分136项,颅颌面硬组织立体形态图具有能多方向观察、光滑、透视感强等特点。
Four parts items consisting of 136 items are selected first and 3-D perspective curving illustrations may be rotated for viewing in all directions.
图2 - 6为与项目有关的主要组织结构类型的关键特征。
Figure 2-6 shows key project-related characteristics of the major types of organizational structures.
平面组织计划包含了平洋村大桥的总体平面图以及预制场和项目部的局部平面图。
Plane plans include Ping Lai Bridge and the overall plan of prefabricated field and the local Department of the project plan.
给出一份组织图和团队成员名单、过程负责人和发起人,6西格玛黑带应能识别出哪些是成功机率小的项目。
Given an organization chart and a listing of team members, process owners, and sponsors, the Six Sigma Black Belt should be able to identify projects with a low probability of success.
用例包图的读者主要是项目的各种涉众,因此图形的组织必须满足他们的需求。
The primary audience of use-case package diagrams is project stakeholders; therefore, the organization of these diagrams should reflect their needs.
用例包图的读者主要是项目的各种涉众,因此图形的组织必须满足他们的需求。
The primary audience of use-case package diagrams is project stakeholders; therefore, the organization of these diagrams should reflect their needs.
应用推荐