• 一旦有了清单,在一边写下项目编号

    Once you have your list, number the items down one side of the paper.

    youdao

  • 这些字段项目编号一个表示已工作时间

    The fields are the project number and a value representing the time worked.

    youdao

  • 也许他们忘记了他们保单编号或者他们准确了解索赔金额应该包含哪些项目

    Perhaps they forgot their policy number, or they want to know exactly what to include in the claim amount.

    youdao

  • 项目编号反映列子索引中

    The line item number is reflected in the array sub-index.

    youdao

  • 这时,请注意python使用了排序其中集合中的项目从零开始编号

    At this point, notice that Python USES zero ordering, where the items in a collection are numbered starting with zero.

    youdao

  • 如果团队进行到项目编号3所指出的任务,则确定LDAP服务器是否尚未构建衡量项目进度推后多久一项简单工作

    If the team is late on item number 3, it is an simple effort to identify that the LDAP server has not been built out yet, and to measure how far it will put you behind schedule.

    youdao

  • 编制项目专用文件登记薄,以记录唯一文件编号、文件标题修订状态分发状态等信息确保修订状态的控制

    Document registers specific to the project are generated which identify the unique document number, title, revision status and distribution to ensure that revisions status is maintained.

    youdao

  • 同级观点以项目符号编号的形式排列

    Use bulleted or numbered lists for items in a series.

    youdao

  • 所有这些项目以及包装标有零件编号说明

    All items were well packaged and marked with a part number and a description.

    youdao

  • 一位来自亚当森最后提示安装所有项目编号奖章

    One last hint from Adamson: install ID medallions on all your projects.

    youdao

  • 可以发送我们电子邮件项目编号

    You can send the item number to our email.

    youdao

  • 因此如果喜欢分开图形里显示文本的话,那么你可以切换一个不同布局里,将文本显示项目编号

    So if you didn't like having all of the text in separate shapes, you can switch to a different layout that shows all of the text as bullets.

    youdao

  • 投标人在汇款时务必注明投标项目招标编号否则,因款项用途不明导致投标无效等后果投标人自行承担

    The bidders should indicate the biding numbers of the bid project, otherwise, the money purposes unknown would cause bidding invalid and it shall be assumed by the tender.

    youdao

  • 段落样式字体名称字号;字体颜色加粗;倾斜;下划线对齐居中对齐;对齐;项目符号编号列表减少进量;增加缩进量。

    Paragraph Styles; Font Names; Font Size; Font Color; Bold ; Italic; Underline; Align Left; Center; Align Right; Bullets; Numbered List; Decrease Indent; Increase Indent.

    youdao

  • 资料表,其中包含哪个ID编号对应于哪个项目的相关资讯

    The table that contains information about which ID number is equivalent to which item.

    youdao

  • 战术拆散营销活动项目编号

    The days of tactical, disjointed marketing campaigns and programs are numbered.

    youdao

  • 所有图纸文件标明客户项目编号鉴别号。

    All documents and drawings shall state the name of Client, Work No., Identification No.

    youdao

  • 矩阵代表所有项目名称编号工程法案材料” ,要求建设组件组装生产厂

    The Matrix shall represent all items (Description and Part Number) on the engineering "Bills of Material", required to build (component or assemble) the product at the plant.

    youdao

  • 课题福建省重点科研项目《信息网络安全防护技术》(项目编号2001H103一部分

    Our work is a part of a key research project of Fujian province-Information Network Security Protection Techniques (No. 2001H103).

    youdao

  • 作者承担任务,本课题来源于河南省自然科学基金项目仿数字化加工技术研究”,编号:004053100。

    My dissertation has drawn from the project - the Study of Copying & Digitizing Machining Technology which is sponsored by Natural Science Foundation of Henan province(Item number: 004053100).

    youdao

  • 新型材料动态切削温度测试系统一课题来源于中国工程物理研究院重大基金项目(项目编号:2001Z 0301)。

    The project of the new dynamical cutting temperature measuring system for chemical explosive material is funded by China Academy of Engineering Physical (NO. 2001z0301).

    youdao

  • 2007年- 2009年,863项目起伏地表条件下矿体快速定位直流电理论技术编号:2006aa06 Z 109。

    2007-2009, 863 High-Technology Project: Technique of Rapid Location of Ore-body in Mountain Area with 3d Direct Current Electrical Method, Granted Number: 2006aa06z109.

    youdao

  • 可以填写网页表格我们联系。有关合作项目咨询填写项目编号

    You may also contact us via filling online form. Please correctly refer the project number if you are seeking cooperation opportunities.

    youdao

  • 提交8编号样品提供一份检验报告,其中应提供随附检验要求中各个项目的检验结果。

    Submit 8 numbered samples and an inspection report for all characteristics listed on the attached inspection Requirements.

    youdao

  • 提交8编号样品提供一份检验报告,其中应提供随附检验要求中各个项目的检验结果。

    Submit 8 numbered samples and an inspection report for all characteristics listed on the attached inspection Requirements.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定