保存您的更改并关闭管理控制台。
注销并关闭管理控制台。
保存您的配置(如图36所示),并关闭管理控制台。
Save your configuration, as shown in Figure 36, and close the administrative console.
实行半封闭管理,执行宿舍、校门双重出入登记制度;从严管理与教育疏导相结合。
It practices the semi-closed management and adopts the dorm and school gate double registration system, highlighting the combination of the strict management and educational guidance.
球阀主要供开启和关闭管道和设备介质之用。
Ball valve for opening and closing the main pipe and equipment used media.
指定的数据表不存在。请关闭管理单元,再试一次。
The specified data table does not exist. Please close the management console and try again.
工业园实施封闭管理,物流中心满足不同商品的周转、存放。
The garden will be managed separately and independently. The logistics center will satisfy the turnover and preservation of different goods.
注意:吹灰器维护检修时,一定要先切断电源,检修阀门时应关闭管路总阀。
Caution: Before maintenance, shut off the power and close the main valve.
基于血流变理论,设计了一套用于测量不同切变率下表观粘度的密闭管道系统。
Based on hemorheology theory, a suit of airtight pipeline system is designed, which is used to measure apparent viscosity with different shear rates.
通过称量心轴和塑料薄膜管以得到初始重量,然后将浆料复合物沉积到密闭管中。
An initial weight is obtained by weighing the mandrel and the tube of plastic film then a slurry composition is deposited inside the closed tube.
介绍密闭管道式钢丝热镀锌工艺、设备及技术参数,详细分析镀层的性能和工艺装置。
To introduce process, equipment and technology parameters of sealed pipe type hot galvanizing for steel wire and to analyze in detail property of coat and process devices.
此外,在科学喂饲的基础上,结合微电脑自动控制提出以日龄为基准的全封闭管理模式。
Moreover, on the basis of scientific feeding and automatic control, a whole course management way based on hens growth period is developed.
停泵时先按下电控箱上泵的停止按钮(红色),泵停止运转后,关闭管路上的进水阀和排出阀。
When the pump is going to stop, first press the stop button (Red), then close the water intake valves and the discharge valve.
第三十九条建筑施工企业应当在施工现场采取维护安全、防范危险、预防火灾等措施;有条件的,应当对施工现场实行封闭管理。
Article 39 the construction enterprises shall take measures aimed at maintaining safety, preventing dangers and fires. When condition allows, the construction site shall be sealed up.
第三十九条建筑施工企业应当在施工现场采取维护安全、防范危险、预防火灾等措施;有条件的,应当对施工现场实行封闭管理。
Article 39 the construction enterprises shall take measures aimed at maintaining safety, preventing dangers and fires. When condition allows, the construction site shall be sealed up.
应用推荐