• 钢-混凝土组合连续中间支座附近为负弯矩区,导致桥面混凝土开裂缩短使用寿命

    Negative bending moment nearby the middle supports of composite steel-concrete continuous beam bridge, will cause floor deck concrete to crack and shorten its life.

    youdao

  • 讨论了初始挠曲混凝土连续组合极限承载力失稳屈曲临界荷载影响

    The influence of initial displacement on load bearing capacity and critical load of steel concrete composite structure is discussed.

    youdao

  • 海淀公园人行天桥位于北京海淀公园内,其钢-混凝土组合连续双线双曲下承式

    The pedestrian overbridge of Haidian Park is located in Beijing Haidian Park, whose steel-concrete continous beam is a bifilar and hyperbolic through box beam.

    youdao

  • 本文基于大型有限元软件ANSYS,建立预应力钢-混凝土连续组合非线性有限元分析模型

    Based on ANSYS programs, the nonlinear finite element models of two-span prestressed steel-concrete continuous composite beam were established.

    youdao

  • 钢-混凝土连续组合某些情况下需要按照部分连接设计。

    Study on the finite element model of shear connector in integration part of composite beam;

    youdao

  • 钢-混凝土连续组合某些情况下需要按照部分连接设计。

    Study on the finite element model of shear connector in integration part of composite beam;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定