简述了板石矿业公司上青矿640主运输平巷在硐口段施工过程中,克服地质条件复杂、多变的现状,采用撞楔超前支架法施工,硐口掘凿获得成功。
The geological condition is complicated and varies often. Using the method of pre-support through hammering wedge, the cave mouth digging work of No. 640 main transportation channel was successful.
顺槽;超前支护支架;工作面;应用;研究;
其它的情况,需要及时支护,或者超前最后一个支架进行支护。
In others, close support, or support ahead of the last set, is required.
神华集团神东矿区哈拉沟煤矿在长壁工作面回风巷中采用了一种新型自移式超前支护支架组。
A new type self-walking advance timbering support set is adopted in longwall coal mining face of Halagou coal Mine, Shendong coal District by Shenhua Group co.
寺河矿综采工作面巷道采用顺序开采的回采方式。选用7200/23/38 A型垛式支架对巷道进行超前支护,实践中提出了支护过程中存在的几点问题并提出了改进意见。
Sequential mining is utilized in the fully-mechanized face in Sihe mine. 7200/23/38A chock support is used in entry, some problems on its usage and related improvement opinions are put foreward.
寺河矿综采工作面巷道采用顺序开采的回采方式。选用7200/23/38 A型垛式支架对巷道进行超前支护,实践中提出了支护过程中存在的几点问题并提出了改进意见。
Sequential mining is utilized in the fully-mechanized face in Sihe mine. 7200/23/38A chock support is used in entry, some problems on its usage and related improvement opinions are put foreward.