美国电力公司(AEP)用两年时间建设了一条从西弗吉尼亚到弗吉尼亚的输电线,但是审批过程却花费了14年。
American Electric Power (AEP) built a transmission line from West Virginia to Virginia in two years. The approval process had taken 14.
美国电力公司安装了7兆瓦的电池,每个有公共汽车那么大,用来缓解输电线的超负荷现象,另外还有4兆瓦的电池还在研制中。
American Electric Power co. Inc. has installed 7 megawatts of the bus-sized batteries to ease congestion on its transmission lines, and it has an additional 4 megawatts under development.
同样,英国有线电视公司NTL也已经买下了维珍移动公司,还有,去年美国最大的电线电缆运营商与无线网络运营商斯普林特·纳克斯泰尔也进行了一次商业合作。
Similarly, NTL bought Virgin Mobile, and America's big cable operators last year struck a deal with Sprint Nextel[2], a wireless operator.
同样,英国有线电视公司NTL也已经买下了维珍移动公司,还有,去年美国最大的电线电缆运营商与无线网络运营商斯普林特·纳克斯泰尔也进行了一次商业合作。
Similarly, NTL bought Virgin Mobile, and America's big cable operators last year struck a deal with Sprint Nextel[2], a wireless operator.
应用推荐