采用移动模架施工多跨连续梁时,线形控制有其自身的特点。
The geometrical alignment control for the construction of multi-span continuous girder Bridges with MSS (Movable Support System) has its own characteristics.
介绍桥面移动塔吊施工工法,该工法采用移动塔吊与移动模架联合施工。
The construction technique of bridge deck mobile tower crane was introduced in this paper.
介绍移动模架施工现浇混凝土连续箱梁的施工工艺,以及在施工中应该注意的事项。
This article gives the construction procedure and instructions for on-site casting of continuous concrete box beam with mobile mould.
随着我国高速铁路建设全面开工,移动模架的施工工艺在高铁桥梁施工中得到了广泛的应用。
Along with the overall startup of the construction of our countrys high speed railway, the construction technics of MSS has been widely used in the construction of high speed railway Bridges.
为移动模架造桥机施工过程中抗风安全性提供了理论保障,可为其他大型移动模架造桥机抗风特性提供参考。
That provides theoretical guarantees for anti-wind security of MSS during the construction process, and provides references for other large MSS anti-wind characteristics.
介绍了新牌坊立交工程采用移动模架施工工艺、移动模架组成、质量安全控制措施。
This article introduced the construction craft and components of moveable formwork construction technology and quality control measure.
从计算结果来看,在该项目中,连续钢桁梁施工风险最大,箱梁移动模架施工风险次之,深水基础施工风险最小。
According to the computing result, in the project, the construction risk of continuous steel truss is the largest, followed by box-girder slide shuttering forms and deepwater foundation.
广州黄埔大桥建设中使用的MSS62.5移动模架造桥机是世界最大跨度的造桥设备,其提升重量、提升高度在同行业中也是最大、最高的。
The span of the MSS62.5 overhead gantry is the longest one in the world. The height and the weight of the upgrade is also the biggest in construction.
广州黄埔大桥建设中使用的MSS62.5移动模架造桥机是世界最大跨度的造桥设备,其提升重量、提升高度在同行业中也是最大、最高的。
The span of the MSS62.5 overhead gantry is the longest one in the world. The height and the weight of the upgrade is also the biggest in construction.