四台矿在开拓14号层404东部盘区过程中,盘区巷道所穿位置地质构造极其复杂,给盘区巷道的掘进带来了极大的困难。
In the course of carving out NO. 14 coalbed 404 of the east area in Sitai mine, it brings a lot of difficulties during digging that geologic structure is very complex in area of digging.
通过对大同矿务局四台矿402盘区的野外实际应用,发现了两个陷柱落构造,与实际资料基本吻合。
The study result in No. 402 area of Datong city shows 2 fallen columns found by CSAMT method.
通过对大同矿务局四台矿402盘区的野外实际应用,发现了两个陷柱落构造,与实际资料基本吻合。
The study result in No. 402 area of Datong city shows 2 fallen columns found by CSAMT method.
应用推荐