本研究对航空母舰毁伤效果的评估和火力计划方案的制定具有重要指导意义。
This research has the profound guidance to evaluate the damage effectiveness of aircraft carrier and to set down the firepower plan project.
CTI公司为波音公司未来战斗系统计划做出了贡献,波音公司和CTI公司都参与了美国陆军火力卓越中心的集成工作。
CTI is a contributor to the Boeing Future Combat Systems program, and Boeing and CTI are partners in the U.S. Army's Fires Center of Excellence integration effort.
CTI公司为波音公司未来战斗系统计划做出了贡献,波音公司和CTI公司都参与了美国陆军火力卓越中心的集成工作。
CTI is a contributor to the Boeing Future Combat Systems program, and Boeing and CTI are partners in the U.S.Army's Fires Center of Excellence integration effort.
美国环境保护局(EPA)在上个月发表了一份声明,计划修改火力发电厂(如哈德菲尔德渡船公司)用水排放的标准。
The Environmental Protection Agency, in a statement last month, said it planned to revise standards for water discharges from coal-fired power plants like Hatfield’s Ferry.
现在这些批评家们有了另外倾泻火力的地方了:Izea计划推出一个名叫“付费推”(“SponsoredTweets ”)的广告平台。
Now those critics will have something else to get up-in-arms about: Izea is planning a launch of a new AD platform called "Sponsored Tweets."
在它北边,南部蒙大拿发电及输电公司说,“法规的不确定性”已经迫使他们延迟在大瀑布附近建造250 MW的海雾火力发电厂的计划。
Farther north, Southern Montana Electric Generation and Transmission Co-operative says "regulatory uncertainties" have forced it to defer plans for its 250mw Highwood coal plant near Great Falls.
与所有现有的和计划的美军火力支援系统协同使用,同样用于联合野战炮兵c3系统。
It operates with all existing and planned U. s. fire support systems as well as allied field artillery C3 systems.
中国国家能源局下发的该通知取消了103个计划或在建项目,涉及未来120吉瓦的火力发电量。
The announcement, made by China's National Energy Administration, cancels 103 projects that were planned or under construction, eliminating 120 gigawatts of future coal-fired capacity.
CTI公司为波音公司未来战斗系统计划做出了贡献,波音公司和CTI公司都参与了美国陆军火力卓越中心的集成工作。
CTI is a contributor to the Boeing Future Combat Systems program, and Boeing and CTI are partners in the U. S. Army's Fires Center of Excellence integration effort.
针对此现状,提出了一种负荷率偏差法,用于解决直调火力发电单元月度电能交易计划编制问题。
For this status, this paper proposes a new load ratio deflection method for making monthly trade schedule of directly dispatched thermal power generation units.
以面向实际应用为目的,提出了一种考虑输电网络损耗及线路过负荷约束的火力发电机起停计划方法。
For the purpose of practical use a unit commitment method considering transmission losses and line overload constraint is proposed in this paper.
以面向实际应用为目的,提出了一种考虑输电网络损耗及线路过负荷约束的火力发电机起停计划方法。
Combining with the actual situation of rural power network, it put forward the measures of reducing power network loss from two aspects of technology and management.
以面向实际应用为目的,提出了一种考虑输电网络损耗及线路过负荷约束的火力发电机起停计划方法。
Combining with the actual situation of rural power network, it put forward the measures of reducing power network loss from two aspects of technology and management.
应用推荐