渗渠式集水廊道是一种集取地下水的构筑物形式。
The infiltration gallery is widely used in the northeast and west-east areas of China to collect under-ground water.
研究表明,在一定条件下渗渠集水量的大小与模拟河流处的水位高低近似呈正比。
The conclusion indicated that under certain conditions, the volume of infiltration gallery flow and water levels were directly proportional.
土工膜料选择、厚度确定、结构设计、膜料连接及渗渠布置形式等关系到取水量的大小。
The soil work film anticipate a choice, thickness assurance, structure design, the film anticipate conjunction and the Shen dike arrange form etc. relation arrive size that take water's quantity.
渗渠工程设计主要包括水平集水管、反滤层、导水管、集水井、泵房和其他附属构筑物等。
The design of infiltration ditch contains the obtaining water tube, anti-filter layer, well, pump house and other accessory building.
因此,在新疆利用渗渠集取河渠及其岸边地下浅含水,对改善人畜用水质量有着很明显的效果。
So the infiltration ditch is used to obtain river and bank water, which has a efficient result to improve the drinking water of people and animals in Xin Jiang.
在此基础上,总结了低渗油藏井网适应性研究的一般方法,并指出了张天渠油田目前井网的主要不适应性因素。
On the basis, summarized the common method of well pattern adaptability research of low permeability reservoir, pointed out the major non-adaptability factors in the Chang-2 reservoir in current.
在此基础上,总结了低渗油藏井网适应性研究的一般方法,并指出了张天渠油田目前井网的主要不适应性因素。
On the basis, summarized the common method of well pattern adaptability research of low permeability reservoir, pointed out the major non-adaptability factors in the Chang-2 reservoir in current.
应用推荐