通过对芦岭井田煤层瓦斯地质因素定性定量分析认为,区域地质构造是控制矿井煤层瓦斯的关键地质因素;
Through the qualitative and quantitative analysis of gas geological factors in Luling coal mine, the regional geological structure is the key geological factors of mine coal gas control.
通过对运输事故的分析,构造地下矿运输事故的事故树,找出发生事故的主要因素。
According to the analysis of haulage accident and the construction of accident tree, the main cause of accident is found out.
分析了屋面防水卷材渗漏的原因:如外界环境因素的影响、施工方法不当的影响、屋顶本身构造及使用过程的影响等;并对其渗漏常见现象提出了解决方法。
This paper analyzes the causations of roof waterproof roll leakage, such as the effect of environment factors, unmerited construction method, roof structure and usage course.
研究结果表明用神经网络BP算法构造的网络模型,用于练铁工序能耗多因素的定量分析是可行的。
The research showed that it was available to apply BP algorithm in the quantitative analysis of several factor of the energy intensity in the iron-making process.
然后,用回归分析法建立起小构造复杂程度与影响地质因素之间的关系模型。
Second, the relational model between the complicated degree of small structure and geological influence factors is built by regression analysis.
在建筑设计早期阶段,很多建筑构造及设计因素尚未确定,很难用建筑能耗软件进行建筑负荷分析。
In the early stages of building design, many factors are not determined and It is difficult to analyse heating and cooling loads using the building energy softwares.
通过分析发现,影响该区崩滑形成的因素有区域地质构造、地层岩性、地形地貌及气象水文条件。
The influence factors of collapse-slide are regional tectonic, stratum lithologic, geomorphic, meteorological and hydrographic characteristics of Changbai Mountain.
本文通过对六苴铜矿床的矿床地质特征分析,认为控矿因素可归结为下列几个方面:层位、岩性、构造、岩相、古地理等。
According to the geological characteristics of Liuju copper deposits, the controlling ore-forming factors include stratigraphy, lithology, structure, lithofacies and paleogeography.
对十二矿影响煤与瓦斯突出的井田地质构造、煤体结构、煤厚及其变化、煤层围岩等地质因素进行了分析。
The geologic factors which have effected on the well geologic structure, coal structure, coal thickness and its changes, coal seam surrounding rock and some other factors have been analysed.
构造一对称拱坝作为对比拱坝,以白鹤滩拱坝为例,采用有限单元法对拱坝的地形不对称因素进行分析。
The factors of topography asymmetry upon the arch dam are analyzed in the essay by finite element based on Baihetan Symmetric Arch Dam.
分析认为,滑坡发育的基本条件有软硬相间的有利地层结构、地质构造条件等;滑坡发育的诱发因素有降雨、水库蓄水及人类活动等。
The basic conditions of landslide development are the stratum structure and the tectonic geology mainly, and the induced factors are the rainfall, impoundment, the activities of human being and so on.
本文对晚新生代贵州喀斯特地貌演进的三大控制因素 ,即地质基础、新构造运动及挽近气候波动进行了分析论证。
In this paper, three determined factors influencing on the evolution of karst geomorphology of upper Cenozoic in Guizhou, e.
在秩效应排序的基础上,构造了平均秩效应原则,并对因素各水平进行有向聚类分析。
Based on rank effect in order of size, a principle of the average rank effect is constructed and the ordinal cluster analysis is done for every level of factor.
基于数值模拟结果 ,分析了影响空洞闭合的主要因素及其影响规律 ,构造了考虑各种影响因素在内的锻合压下率计算公式。
The stress and strain distribution and evolution during pore deformation are analyzed and various factors influencing the pore closure and welding are examined.
所有这些分析证实,构造挤压作用是导致库车坳陷北部中生界储集层流体增压的主要因素之一。
It is suggested that the tectonic compression is one of the main factors resulted in the incremental pore fluid pressure of Mesozoic reservoirs in northern Kuqa depression.
结果表明:计算值能够较好地拟合实测值,证明自重应力水平构造应力是形成地应力主要因素。根据回归分析结果,获得了整个工程区域岩体的地应力分布。
The regression output shows that the calculated stress match the measured data, also the gravity and horizontal tectonic stress are the main factors of the stress field in the project area.
利用快速拉格朗日分析方法,单因素分析了工作面斜长和构造应力对煤层底板应力应变的影响。
In this paper, by usage of Fast Lagrangian analysis of Continua, analysis the coal seam floor's stress and strain regularity influenced by the facing length and the construct stress.
对建筑立面构造设计与建筑立面照明进行了分析,建议了高层建筑立面构造设计时应考虑的因素。
This paper analyses the relationship between the facade fabric design and the lighting design, and proposes the factors that should be considered in the facade fabric design process.
利用GMDH从数据中自动选择最优复杂度模型的能力,构造了一个分析企业净利润影响因素的分析模型。
Make use of GMDH s ability which chooses the superior complications model automatically in the data; we develop an analytical model that analyzes the influence factors of the enterprises net profit.
分析了导致底板崩裂的主要原因,主要包括跨中合龙束张拉时产生的径向力作用、非预应力钢筋构造因素及施工影响等;
The main causes of bottom flat crack are analyzed, mainly including radial force generated by closure strands stretching in middle span , non-structural elements and construction effects , etc.
通过对矿区矿床地质特征及控矿因素的研究,分析认为地层、构造、岩浆岩对矿床的形成起到了不同的控制作用。
Through the research on its geological characteristics and ore controlling factors, it is believed that strata, structure and magmatic rock played different roles in the foemation of the deposit.
将贡献于经济增长的因素用来构造指标体系,综合了增长因素分析、AHP、综合指标评价和聚类分析,构造一种新的综合评价系统。
A new comprehensive evaluation system based on congregating approach of growth elements analysis, cluster analysis and AHP is presented in the paper.
采用层次分析法,通过构造判断矩阵,确定各个因素的权重。
Through AHP, the judgment matrix is structured and the weight of each factor is determined.
阐述了曙4 4 0 3井区潜山储层特征及其分布规律,分析了构造、岩石性质等因素对储集性质的影响。
Reservoir characteristics and distribution regularities of buried hill reservoir in Shu 4 4 03 area are presented, and the influence of structural, lithologic natures and the etc.
为了分析天气因素对空中突击任务的影响,采用影响图构造了考虑 天气和 天气预报的定性分析模型。
To analyze the weather influence on air strike mission, the qualitative analysis model is constructed by influence diagram .
对地震时易于触发滑坡的地貌坡度及地质构造等因素进行了分析。
Some factors, such as the topographic slopes and geological structures where landslide always occur in case of an earthquake are studied.
分析结果表明:该滑坡岩体破坏的具体形式为岩梁弯曲折断,其中复杂的地质构造及较发育的地下水是产生该滑坡的主要因素;
The analysis results indicate that Mouzhudong landslide is a typical failure of rock beam bend. The complex geologic condition and enough groundwater are major factors.
文章从成矿地质条件、矿床地质特征等入手,分析了矿床的控矿因素,认为该矿床受含矿地层、韧脆性剪切带构造、岩浆岩等因素的制约。
Based on ore-forming condition and ore geology, ore-controlling factors are analyzed. It is suggested that the deposit is controlled by ore-hosting strata, ductile-brittle shear zone and magmatism.
文章从成矿地质条件、矿床地质特征等入手,分析了矿床的控矿因素,认为该矿床受含矿地层、韧脆性剪切带构造、岩浆岩等因素的制约。
Based on ore-forming condition and ore geology, ore-controlling factors are analyzed. It is suggested that the deposit is controlled by ore-hosting strata, ductile-brittle shear zone and magmatism.