• 创建并行作业并描述其内容。

    Create a parallel job and outline its contents.

    youdao

  • 创建一个新的并行作业。

    Create a new parallel job.

    youdao

  • 确认您并行作业的框架与图1类似。

    Verify that the skeleton of your parallel appears similar to Figure 1.

    youdao

  • 将这两个连接器放到并行作业画布的另一面。

    Place these two connectors at opposite sides of the parallel job canvas.

    youdao

  • 将许多并行作业的执行状态从GEE集合报告给PJM。

    Execution status of the many parallel jobs is reported to the PJM from the collection of GEEs.

    youdao

  • 找到XMLInput阶段并将其拖放到并行作业上。

    Locate the XML Input stage and drag it to the parallel job.

    youdao

  • 步骤2:创建DataStage并行作业并概括其内容。

    Step 2: Create a DataStage parallel job and outline its contents.

    youdao

  • 向该并行作业添加两个DB 2Connector阶段。

    Add two DB2 Connector stages to the parallel job.

    youdao

  • 找到Transformer阶段并将该图标拖放到并行作业面板。

    Locate the Transformer stage and drag this icon to the parallel job pane.

    youdao

  • 将DB 2Connector阶段添加到并行作业的右上部分。

    Add a DB2 Connector stage to the top right portion of the parallel job.

    youdao

  • 将DB 2Connector阶段拖放到该并行作业上。

    Drag the DB2 Connector stage to the parallel job.

    youdao

  • 实验结果表明,这种负载平衡方法能够有效地提高并行作业的运行性能。

    Experiments show that the method using these algorithms can effectively improve executive performance of the parallel job.

    youdao

  • 将SequentialFile阶段添加到新并行作业作业设计区的左上部分。

    Add a Sequential File stage to the top left portion of the job design area for the new parallel job.

    youdao

  • BACKFILL方法在并行作业调度时并不能有效地的利用CPU资源。

    The BACKFILL algorithm is not efficient for the CPU utilization of job scheduling in parallel system.

    youdao

  • 现在,您的DataStage作业的第一部分已经具有一个并行作业骨架。

    You now have a parallel job skeleton for the first part of your DataStage job.

    youdao

  • 为评估计算网格上并行作业的无中心式调度,设计了基于离散事件的模拟系统J3S。

    To evaluate decentralized scheduling of parallel jobs on computational grids, the discrete event-based simulation system J3S is designed.

    youdao

  • 检查您的并行作业设计是否类似于图5,它显示了链接在一起的各个阶段,如步骤6所述

    Verify that your parallel job design is similar to Figure 5, which shows the various stages linked together, as described in Step 6

    youdao

  • 组合使用并行作业管理器(PJM)、n层缓存结构和关联路由,可以提供功能强大的高性能计算网格。

    Combining the Parallel Job Manager (PJM), N-tier caching structures, and affinity routing provides a powerful, high-performance compute grid.

    youdao

  • 该应用程序的多个实例可以使用并行作业管理器(PJM)来进行分派,其中各个分区处理不同的数据部分。

    Multiple instances of that application can be dispatched using the Parallel Job Manager (PJM), where each partition processes a different section of the data.

    youdao

  • 分区还允许并行作业的分配(例如,通过将设计的特定部分分配给一个团队,而将设计的另一部分分配给另一个团队)。

    Partitions also allow for the assignment of parallel work (for example, by assigning the design of a particular set of parts to one team, and of another set of parts to another team).

    youdao

  • 计算网格包括一个称为并行作业管理器(PJM)的特性,您可以使用该特性来定义将较大作业分解为许多较小作业的规则。

    Compute Grid includes a feature called Parallel job Manager (PJM) which you can use to define rules for decomposing large jobs into many small jobs.

    youdao

  • 在这四个用例场景中,每个作业都被设计为并行作业,以便充分利用WebSphereDataStage的并行处理能力。

    Each job within the four use-case scenarios is a parallel job designed to take full advantage of WebSphere DataStage's parallel processing capabilities.

    youdao

  • 并行作业管理器层同样也是计算网格的组成部分,可以将较大的作业分解为较小的分区、并为跨集群执行的分区作业提供操作控制。

    Parallel Job Manager tier, also part of Compute Grid, decomposes large jobs into smaller partitions and provides operational control over partitioned jobs executing across the cluster.

    youdao

  • 相反,管理员应该具有更好的操作控制,在停止逻辑作业时,基础结构将会停止正在并行运行的众多作业。

    Instead, the administrator should have better operational control and stop the logical job, where the infrastructure would stop the many jobs running in parallel.

    youdao

  • 网格计算(包括跨端点网格并行执行作业)的原则随着下一代企业应用程序而出现。

    The principles of grid computing, including the parallel execution of a job across a grid of endpoints, emerge as the next generation of enterprise applications.

    youdao

  • 这种并行集群系统之所以被称为伪远程线程,是因为线程是在作业调度器上调度的,但线程内的代码却是在远程计算机上执行的。

    This parallel clustering system is called Pseudo remote threads because the threads are scheduled on the job dispatcher but the code within the threads is executed on a remote machine.

    youdao

  • 在高并行批处理领域中,比较困难的问题是操作控制,以及管理许多并发执行的作业。

    A difficult challenge in the area of highly-parallel batch processing is operational control and managing the many jobs that are executing concurrently.

    youdao

  • 总体上,集群具备构建、提交、执行和管理串行与并行批作业的能力。

    As a whole, the cluster provides the capability to build, submit, execute, and manage serial and parallel batch jobs.

    youdao

  • 使用一批作业员来并行执行多个任务对cpu密集型任务也大有裨益。

    Utilizing a pool of workers to execute multiple tasks in parallel is also beneficial for CPU-bound tasks.

    youdao

  • 使用一批作业员来并行执行多个任务对cpu密集型任务也大有裨益。

    Utilizing a pool of workers to execute multiple tasks in parallel is also beneficial for CPU-bound tasks.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定