• 敏捷流程寻求工件数减少客户需要数目

    Agile processes seek to reduce the number of artifacts to those the customer needs.

    youdao

  • 系统节省了硬件资源解决了复杂工件控加内存不足等问题

    The system economizes hardware resource and overcomes the problem of insufficient memory of special NC system in modern NC machining of complex workpiece.

    youdao

  • 随着应用程序开发项目中的层次增加生成工件支持应用程序的系统管理随之增加

    As the number of layers increases in any application development project, the number of artifacts produced and the management of the systems that support the application also increase.

    youdao

  • 不仅可以卸载自己的WTE可以减少添加空间工件从而减少构建时间

    It not only offloads your own WTE, but you can also improve the build time so that fewer Numbers of artifacts are added to the workspace.

    youdao

  • 固体保持20—22%之间,补加树脂颜料浆数量决定通过电泳工件数

    The solids level should be maintained at 20 to 22%. The necessary amount of pigment and resin to be added to the tank depends upon the number of jobs run through the tank.

    youdao

  • 解决重构制造系统的制造单元重构求解问题采用粒子算法进行求解,构造路线粒子空间,实现工件量的多加路线分配

    Particle swarm optimization was applied to solve manufacturing cell reconfiguration problem. Particles with sum machining lines dimension were established to assign workpieces to machining lines.

    youdao

  • 结果表明:在权重平均时间不成比例的最一般的情况下,最短时间和最长时间优先规则联合使用给出了使拖工件数最少的优先策略,并对算法的最性进行了证明。

    The priority policy of joint use of the shortest expected processing time and the longest prcessing time is optimal when the expected processing time is non-proportional to the number of the jobs.

    youdao

  • 结果表明:在权重平均时间不成比例的最一般的情况下,最短时间和最长时间优先规则联合使用给出了使拖工件数最少的优先策略,并对算法的最性进行了证明。

    The priority policy of joint use of the shortest expected processing time and the longest prcessing time is optimal when the expected processing time is non-proportional to the number of the jobs.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定