这将是裸眼完井技术的一种革新。
封隔液根据具体完井的要求进行配制。
Packer fluids are prepared for the requirements of the given completion.
超正压射孔工艺是一项射孔完井新技术。
Extreme overbalance perforating is a new perforation completion technique.
在胜利油田钻井、完井中得到了较好的应用。
It is that which successfully used in drilling and completion in Shengli Oilfield.
没有进行增产处理作业(如压裂或酸化)的完井。
A well completion with no stimulation such as fracing or acidizing.
暂堵技术是保护储层钻井完井技术的主要技术之一。
Temporary plugging technology is one of the main drilling and completion techniques for reservoir protection.
从完井系统工程角度提出了完井优化的总体设计思路。
This paper presented the overall design conception for completion optimization from the prospect of well completion systems engineering.
确定最高处理压力是为了避免压开地层或损坏完井部件。
The maximum treating pressure is determined to avoid fracturing the formation or damaging completion components.
有些井刚钻完并进行完井作业后,就立即采取钻杆测试。
Drill stem tests are taken from some Wells almost immediately after drilling and completion operations.
相对较短的厚壁完井部件,它装在预计发生紊流的区域。
A relatively short, heavy-walled completion component installed in areas where turbulence is anticipated.
可用于砾石充填完井和膨胀管完井,进一步提高密封性。
It can also used for gravel packing completion and expansion tube completion to improve high sealing performance.
衬管悬挂器有许多尺寸和规格,以适应各种不同的完井条件。
Liner hangers are available in a range of sizes and specifications to suit a variety of completion conditions.
完井时我们要向作业者提供一份详细的泥浆工程作业完成报告。
At the end of the well we must provide operator with a detailed review of the mud engineering operations performed.
在可能出现腐蚀问题的井中的完井部件所用的专门配制的材料。
A specially formulated material used for completion components in Wells likely to present corrosion problems.
作业完井的一个辅助工具,循环阀用于在压井或启动时循环流体。
As a completion accessory, a circulation valve is included to circulate fluid for well kill or kickoff.
这些风险又主要集中在钻、完井(包括修井) 两个主要环节上。
These risks centralize mainly in drilling and completion operation ( inclusion workover ).
实践证明,水力射孔井能够起到改善完井效果、降低表皮系数的作用。
Water-power deep perforation well can ameliorate perforation completion and reduce skin factor of pollution during drilling.
在第一根套管柱和防喷器组(钻井时)或完井后的井口之间的一个接头。
The adapter between the first casing string and either the BOP stack (during drilling) or the wellhead (after completion).
本模型可以用于水平井产能计算、完井参数优选和作为酸化解堵的抉择依据。
So this innovative model can be use as horizontal productivity forecast, completion parameter optimization and guideline for acidizing technology.
射孔完井作为现在油气井的主要完井方式,其对油气井产能有着重要的影响。
As a main completion pattern in current oil and gas Wells, the perforation has a large effect on their productivity.
复合尾管完井工艺在川江566井的成功应用,为今后类似井完井提供了经验。
The successful application of the completion technology with compound tail pipe in Chuanjiang Well 566 provides the experience for well completion of the similar wells in future.
随着油田进入中后期开发阶段,原有的一些完井技术要求已经不能满足现场需求。
At the middle and final stages of oilfield development, the original technical requirements for well completion cannot meet field needs.
从16口超高压射孔完井的压力恢复曲线统计可知,14口井的表皮系数为负值。
From the pressure buildup curve of 16 Wells who used over-high pressure, the skin factor of 14 Wells is negative.
没有任何一个国家拥有,在美国(拥有)能看到的广泛的设备库存-钻机,完井工具等-。
No country has the extensive equipment inventory - RIGS, well completion tools, etc. - found in the US.
定方位射孔完井技术是提高低渗透油气藏和裂缝性油气藏勘探开发效工的一项新技术措施。
Therefore, the oriented perforating completion is a new technology for improving the development benefits of the said reservoirs.
以岩石破坏准则为基础,采用岩石力学的理论和方法,建立了射孔完井临界出砂预测模型。
Critical sanding prediction model with perforated well completion was established using the theory and method of rock mechanics based on rock burst criterion.
通过实践,总结分析了水平井完井方法的特点,并对今后水平井完井方法选择进行了探讨。
Through practice, the features of horizontal well completion was analyzed and discussing the selection method of completions for future.
针对割缝衬管完井方法,进行了完井参数、单根割缝衬管长度、完井管柱结构的优化设计。
For the well completion method by slotted liner, well completion parameters, single slotted liner length and pipe string structure in well completion are optimized.
针对割缝衬管完井方法,进行了完井参数、单根割缝衬管长度、完井管柱结构的优化设计。
For the well completion method by slotted liner, well completion parameters, single slotted liner length and pipe string structure in well completion are optimized.
应用推荐