格拉泽声称,这些建于公元400年至1400年间的土方工程是城市文明的核心。
Glaser claims that these earth works, built between AD 400 and 1400, were at the heart of urban civilizations.
土方工程在几小时内就完成了。
土方计算是工程中经常碰到的问题。
Earthwork calculation is often encountered in building the water projects.
土方工程包罗土方的发掘和换填。
土方量计算有多种算法。
为了准备建筑的底基和道路需进行挖运土方。
General earthmoving will be done to prepare sub-bases of buildings and roads.
你在泥土方面的经验将开阔我们教师的眼界。
Your experience with the earth would enrich our teachers experience.
不牢固的土方将可能掉入开挖区内并伤及工人。
Unstable soil with potential to fall into excavations and injure workers.
在土方机械的设计中舒适发挥着日益重要的作用。
Comfort plays an increasingly important role in interior design of earth moving equipment.
将其用于土方开挖边线处理,在此基础上重新构网。
The boundary of earthwork excavation and the Triangle network can be reconstructed.
感谢中方理解并支持土方关于能源安全的立场和主张。
Berdymukhamedov expressed his appreciation of China's understanding and support of Turkmenistan's position and views on energy security.
论述了在土方施工中几种地下水处理的方法及注意事项。
This paper states some treatment methods and relevant precautions of groundwater in earthwork construction.
待涵管道安装完成并经验收合格后,方可进行土方回填。
To pipe installation is complete and experience the qualified, conducted only after backfill earthwork.
对土方搬运的限制就会在项目的总体预算中节省一大笔费用。
Restraint in earthmoving sets off a chain reaction of savings in the overall project budget.
土方开挖与回填是要有相应的安全措施,要严格按规范施工。
Earth excavation and backfill is to have the appropriate security measures to strictly regulate the construction.
挖方和填方的最小运输问题求解其实是一个土方平衡调配问题。
Solving the smallest transportation question of excavation and fill actually is a question of earthwork balance adjustment.
本文得到的公式同样适用于工程上的土方量及断面面积的计算。
The formulas provided in this paper are also suitable for the computation of the earthwork volumes and profiles.
每个球洞的策略也是与土方以及其他水特征的设计理念一起提出。
The strategy for each hole is proposed along with design concept for earthworks and any water features can also be illustrated.
最令研究小组惊讶的是,这些土方工程在该地区的冲积平原和高地均有出现。
What most surprised the research team is that the earthworks appear in both the region's floodplains and the uplands.
此外,这两个地区的土方工程风格相似,这表明它们是由同一个社会修建的。
What's more, the earthworks in both regions are of a similar style, suggesting they were built by the same society.
碾压或夯实的遍数和顺序必须正确,以保证土方密实度符合要求。
Times and sequence of roll or ram compaction must be correct to ensure that earth compaction degree meets the requirement.
在土方施工中,采用拟合原理求土方体积的方法,有较好的精度。
During earth excavation construction, there is an analog approach process to get the volume of earth excavation.
土方工程:采用两台挖机机械挖土,采用单坑开挖和条形开挖二种方案。
Earthworks: two excavators to be used for excavation, two construction methods like single pit excavation and strip excavation to be adopted.
这件作品创作于1933年,那时距土方工程(如,大地艺术)的兴起还有几十年。
It dates from 1933, decades before the rise of earthworks (ie, land art).
土方开挖是基坑工程的有机组成部分,对挤土桩,须重视地应力释放问题。
Earthwork opening is an organic component in foundation pit construction and attention must be paid to the crustal stress release in treating the packed soil piles.
土方开挖是基坑工程的有机组成部分,对挤土桩,须重视地应力释放问题。
Earthwork opening is an organic component in foundation pit construction and attention must be paid to the crustal stress release in treating the packed soil piles.
应用推荐