可进行普通灌浆、GIN法灌浆、压水试验记录及稳定水位测量。
It can be used for data recording of common grouting, GIN grouting, pressing water experiment and measuring stable water level.
防渗墙施工结束后,进行压水试验和质量检查,满足主坝防渗要求。
After accomplishment of the construction of cutoff wall, water pressure tests and quality inspection were conducted, and the results indicate that the dam meets the anti-seepage request.
采用水泥灌浆后所做的压水试验证明,岩土的渗透性能虽然得到改善,但是达不到设计要求。
The water pressure test after adopting cement grouting proves, although the permeability of rock improves, it can not achieve the design requirement.
该文介绍这一现场模拟试验洞的试验目的、结构设计、观测设计及压水试验要求等方面的问题。
This article introduces problems concerning the purpose of research, design of structure and observation and requirements for water pressure test.
并与同一钻孔中的常规压水试验结果以及其他地区渗透系数测试数据的统计分析资料进行了对比。
The test results are compared with Lugeon test results in the same borehole and statistical analysis of permeability test results in other areas.
马国彦只给出了含水层为层状结构,且其中的裂隙为直立的特殊情况下的交叉孔压水试验的理论解。
The theoretical solution about cross-hole packer test, of which the aquifer is lamellar structure and the fractures are vertical, is put forward in the third bibliography.
采用R/S分析方法对钻孔常规压水试验资料进行了分析,给出了能反映岩体透水性特征的分维数。
The data from conventional water pressure test is analyzed by using R/S method and the fractal dimension of rock mass permeability is obtained.
依据裂隙水流理论,提出了利用压水试验资料分析裂隙岩体水流几何特征和水力学参数的理论和方法。
According to the theory of fracture flow, the theory and methods to analyze the hydraulic and geometric properties of fractured rock using constant-pressure well test data are given.
采用现场大型直剪试验、推剪试验、压缩试验和压水试验,分别研究了矸石山体的抗剪特性、压缩特性和渗透特性。
The shear, compression and seepage characteristics of coal wastes are studied by direct shear tests, compression tests and seepage tests.
通过试验验证了VVER-1000型压水堆在发生全厂失电的情况下,依靠其固有特性,可以建立起自然循环。
Through test , It has confirmed that will development natural circulation in case of blackout in VVER-1000 type nuclear power station , depend on itself intrinsic attributes.
试验和理论分析表明,水流的初生空化和空蚀可以利用常压水洞来模拟。
Experiment and theory analysis shows that the inception cavitation and developed cavitation can be simulated by hydraulic tunnel device in laboratory.
本文介绍了压水堆噪声基准试验信号分析,并从中得出一些有用的结果。
This paper described benchmark test noise signal analysis of PWR and gets some useful results.
为使中国先进研究堆(CARR)具备开展压水堆燃料瞬态试验的能力,本工作对氦- 3回路进行研究与初步设计。
In order to carry out power transient tests for PWR fuel element in China Advanced research Reactor (carr), the research and conceptual design of 3he pressure control loop were completed.
闭水试验和闭气试验是无压管道进行严密性试验最常采用的两种试验方法。
Two commonly used methods of pressurization test of pipelines with free-surface in best common are close water test and close gas test.
通过试验证实了微珠在很高的压力下仍然完好,其密度增加是由于水被压入部分具有较大孔径的微珠中所致。
In this paper, it is proven by testing result that the fine-grains could be in good condition even under great pressure.
完成了压水堆蒸汽发生器管束模拟体的地震响应水分析和试验研究。
The seismic response analysis and experimental study of a model PWR steam generator tube bundle has been completed.
提出了实施分层开采、开展压水锥试验和在剩余油饱和度高的部位钻水平井等改善油田开发效果的措施及建议。
Several measures and Suggestions are presented in order to improve development effects in the field, such as making selective zone production, testing water coning and drilling...
将该材料应用于隧道涌水模型试验,可有效地揭示了位移、应力、渗压等多场信息的变化规律。
This material has been used in a tunnel water-inflow model test; and the variation of the multi-field information such as displacement, stress and seepage pressure has been effectively revealed.
No1压载水舱(No.15分段)气压试验(压头试验)检查。
Inspection air pressure test(with water head) for No1. water ballast tank(No15 block).
No1压载水舱(No.15分段)气压试验(压头试验)检查。
Inspection air pressure test(with water head) for No1. water ballast tank(No15 block).
应用推荐