第十五条轨道交通工程竣工后,轨道交通项目建设单位应当按照设计标准组织工程初验。
Article 15 Upon the completion of CRC engineering, the CRC project construction unit shall, according to the design standard, organize the preliminary testing of the engineering.
第十五条轨道交通工程竣工后,轨道交通项目建设单位应当按照设计标准组织工程初验。
Article 15 Upon the completion of CRC engineering, the CRC project construction unit shall, according to the design standard, organize the preliminary testing of the engineering.
应用推荐