水驱油田进入全面注水开发后,处理好注水问题是原油生产的基础与保障。
After water flooding oil field is put into full operation, water injection becomes the basis and guarantee of oil production.
海拉尔油田贝301试验区块自全面投入注水开发以来,部分井存在注水压力上升快、吸水能力下降的情况。
Since overall waterflooding staged in the No. 301 Bei pilot area in Haila'er oilfield in 2004, rapid injection pressure rise and injectivity drop have occurred in some wells.
海拉尔油田贝301试验区块自全面投入注水开发以来,部分井存在注水压力上升快、吸水能力下降的情况。
Since overall waterflooding staged in the No. 301 Bei pilot area in Haila'er oilfield in 2004, rapid injection pressure rise and injectivity drop have occurred in some wells.
应用推荐