• 采取分步结合基底掏高压冲淤削减摩等促沉手段使建筑物达到自然目的。

    The building incline is naturally rectified by means of reducing piles in steps, excavating soil at the foundation, scouring by high pressure water. The predictive results have reached. In this pa…

    youdao

  • 采取分步结合基底掏高压冲淤削减摩等促沉手段使建筑物达到自然目的。

    The building incline is naturally rectified by means of reducing piles in steps, excavating soil at the foundation, scouring by high pressure water. The predictive results have reached. In this pa…

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定