仪表盘在正常位置时并没有推动到足够靠后的位置来连接线束连接器。
The instrument panel is not pushed back far enough into the harness connector when it is in its fixed position.
系统的正确安装包括取压口的开口位置、连接导管的合理铺设和仪表安装位置的正确等。
Correct project items for system installing includes selecting pressure measure position, paving pipe reasonably and choosing proper install position.
系统的正确安装包括取压口的开口位置、连接导管的合理铺设和仪表安装位置的正确等。
Correct project items for system installing includes selecting pressure measure position, paving pipe reasonably and choosing proper install position.
应用推荐