• 几何非线性对主拱结构稳定性能的影响不大

    The safe stability coefficient only decreased a little when taking into account geometrical nonlinearity.

    youdao

  • 飞鸟式钢管混凝土可简化固定计算

    The main arch of "fly-bird-type" CFST arch bridge can be considered as fixed arch to calculate.

    youdao

  • 双方洞里形成并排20红石

    The main arch's main hole and the both sides abdomen arch the eyelet is 20 red stone arches juxtaposes becomes.

    youdao

  • 并且,钝体截面主拱风速容易产生涡激振动

    The vortex shedding vibration will take place at the relative low wind speed because of arches blunt section.

    youdao

  • 空腹之间立柱支撑主拱圈以上设有腹桥。

    Empty arch bridge is the arch bridge that USES sign pillar to prop up between the main arch and main beam, and has inner-arch on the main arch.

    youdao

  • 计算结果表明非均匀荷载作用空间作用承载能力不利影响

    The results indicated that space effect had disadvantageous influence upon the main-arch carrying capacity under the uneven snow loading.

    youdao

  • 根据线形要求利用模糊理论ANFIS推理系统预测节段的抬高值。

    According to linear request of the entire bridge main arch rib, use fuzzy theory and the ANFIS inference system forecast that various stages raise in advance.

    youdao

  • 荷载比较复杂,需要考虑风速沿高度变化、荷载空间相关性以及之间相互干扰因素

    The wind loads on arches are complex. Some factors, such as wind speeds changing with height and loads spatial correlation and interference between two arches should be taken into account.

    youdao

  • 为桁架式双肋,钢管纵向13制造,采用支架缆索吊机安装钢绞线斜拉挂施工。

    The steel pipe arch was manufactured in 13 segments vertically, erected by cable crane without support and clasped by diagonal tension steel strand.

    youdao

  • 劲性骨架钢管桁架结构转体施工之后通过内填外包混凝土构成箱形截面结构。

    The stiff skeleton is a steel truss structure, which turns into a single cell and single box section of the main arch structure by filling and outsourcing concrete after swivel construction.

    youdao

  • 提出了RC作为先期的跨越结构后期高强石砌体砌筑施工支架,最终由石砌体和RC共同形成主拱的构思。

    RC-masonry combination arch bridge makes rc arch ribs as former spanning structure and falsework of upper masonry's construction. Finally, reinforced concrete and masonry together form arch ring.

    youdao

  • 安装起重机安装跨度金属结构度、水平小车轨道高低轨距偏差架对角线等进行测量

    To install the crane span before installation, camber, level of metal structure of main girder bending, trolley rail height difference, gauge deviation, diagonal bridge survey.

    youdao

  • 若命盘中月亮金牛座位于第二宫之内,木星形成出相位,太阳形成的入相位时,则盘拥有大量财富

    He that hath the Moon in Tairus in the second separating from the square or Opposition of Jupiter, and applying to Trine of the Sun shall obtain very considerable riches.

    youdao

  • 如是下,则梁上度一项外,其余项目可以检查同时可以检查大车运行机构安装质量

    If the cushion in the main beam, in addition to the main beam camber, the rest of the project can also be checked, but also can check the installation quality of the operating mechanism of the cart.

    youdao

  • 南京大胜关长江大桥桥钢桁采用架梁吊机双悬臂架设方案,墩旁托架作为架梁辅助支承体系必不可少。

    Used as the auxiliary supporting system for erection of the spans, the pier-side brackets to be arranged at the main piers of the bridge were indispensible.

    youdao

  • 低级断层是在应力伸展应力以及受断层牵引或在局部地区的升应力等作用形成的。

    The lower-order faults were formed under the action of strike slip stress, extension stress, camber stress and traction of master faults.

    youdao

  • 介绍了高速公路温塘河特大缆索吊装施工经验控制要点

    This paper mainly introduces the cable erection construction experience and the key control points of main span arch boxes of Wentanghe Extra Large Bridge on Chongqing-Linshui Expressway.

    youdao

  • 腹板下料提出了几种不同形式曲线说明了各种不同形式预曲线特点各种不同起重机腹板度曲线的选择。

    Some different pre-eambering curves used in web cutting are presented and their features analysed, with further description of their use for different types of crane.

    youdao

  • 利用BP人工神经网络确定度;

    The construction camber for main beam can be determined by BP artificial neural network.

    youdao

  • 这种大型特种设备建造施工难度大,特别是控制、大型箱体结构变形控制都较一般结构难度大。

    As a type of special equipment, the construction of large-scale cranes is very difficult, especially the main beam camber control and the deformation control.

    youdao

  • 可以看到两侧通身雕刻有天马彩云云龙莲花牡丹以及三角几何等图案

    You can see, the main and ventral arches are carved on both sides of Tong Shen ma Caiyun days, Yunlong, lotus, peony, and triangular geometric patterns and so on.

    youdao

  • 介绍了渝邻高速公路温塘特大箱缆索吊装施工经验及控制要点。

    The steel tubular arch truss articulations of Qinggan River bridge were fastened and connected by cableway crane with cable-stayed cantilever.

    youdao

  • (5)上端刚性连接下端桥墩(9)刚性连接。

    The upper end of the side arches (5) has the rigid connection with the side span girders and the lower end has the rigid connection with the main piers (9).

    youdao

  • (5)上端刚性连接下端桥墩(9)刚性连接。

    The upper end of the side arches (5) has the rigid connection with the side span girders and the lower end has the rigid connection with the main piers (9).

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定