Zhou Ning power station each index had reached or exceeded designed competence originally by optimizing, the automatic degree of the system and dependability are relatively high.
通过系统设计与优化,经过试运行,周宁水电站各项指标达到或超过了原设计水平,系统自动化程度与可靠性较高。
Zhou Ning power station each index had reached or exceeded designed competence originally by optimizing, the automatic degree of the system and dependability are relatively high.
通过系统设计与优化,经过试运行,周宁水电站各项指标达到或超过了原设计水平,系统自动化程度与可靠性较高。
应用推荐