• Now suppose that you want your Data View to include only current products where the units on order equals zero, so that you can decide whether to order additional units.

    假设数据视图包含订购数量等于当前产品以便决定是否订购额外数量。

    youdao

  • When grounding fault happens at the time when current is zero, the transient value is too small, in order to prevent it, the paper brings forward the current increment method to select faulty line.

    防止电流零点附近发生接地故障暂态太小论文提出利用电流增量进行故障选线

    youdao

  • In order to prevent the primary current from flowing in the reverse direction during zero state, two diodes are added in series with the lagging switches respectively.

    为了使电流状态时减小到零后不再反方向流动两个滞后管中分别入一个二极管

    youdao

  • A new method based on calculating approximate entropy of transient zero-module current is presented in order to locate the single phase grounding fault in non-solidly earthed network.

    提出一种通过计算态零模电流近似确定小电流接地故障区段的方法

    youdao

  • A new method based on calculating approximate entropy of transient zero-module current is presented in order to locate the single phase grounding fault in non-solidly earthed network.

    提出一种通过计算态零模电流近似确定小电流接地故障区段的方法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定