The paper mainly deals with the analysis and design of coal sales management system of YuanBaoShan open pit coal mine.
本文主要对元宝山露天煤矿煤炭销售管理系统进行了分析及设计。
The paper introduced the design and application of CIMS for Yuanbaoshan coal Mining enterprise and a total model was given.
介绍了元宝山露天煤矿CIMS设计与实施的方法,并给出了系统的总体模型。
This paper is to make an synthetical evaluation aimed at economy, environment and social benefits of dent area in Yuanbaoshan 2nd mine.
以元宝山矿二井塌陷区为研究对象,对所研究对象的经济、环境和社会效益三者进行综合评价。
The author, centering on the topic of project planning, analyzes the project planning process combined with the practice of the Yuanbaoshan third engineering fourth machine group construction project.
作者结合元宝山三期工程四号机组建设的实践,紧紧围绕项目计划这一主题,研究基于不确定性分析的项目计划过程。
The author, centering on the topic of project planning, analyzes the project planning process combined with the practice of the Yuanbaoshan third engineering fourth machine group construction project.
作者结合元宝山三期工程四号机组建设的实践,紧紧围绕项目计划这一主题,研究基于不确定性分析的项目计划过程。
应用推荐