• The project board expected the project to be complete within a reasonable timeframe for X, whereas the project needed the time to complete Y.

    项目委员会期望X合理时间框内完成项目,然而项目需要Y时间完成。

    youdao

  • With the optimal project, the defects of Y-type seal-ring were eliminated. As a result, the Y-type seal-ring can satisfy the seal requirement of hydraulic prop with water medium.

    依据方案成型Y密封圈缺陷得以消除符合介质单体液压支柱密封元件的要求

    youdao

  • With the optimal project, the defects of Y-type seal-ring were eliminated. As a result, the Y-type seal-ring can satisfy the seal requirement of hydraulic prop with water medium.

    依据方案成型Y密封圈缺陷得以消除符合介质单体液压支柱密封元件的要求

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定