• The curtain grouting project for the dam of Xiaolangdi Multipurpose project is large in size, big in difficulty, complex in geological conditions and high in technical requirements.

    小浪底大坝帷幕灌浆工程规模难度地质条件复杂技术含量

    youdao

  • The Xiaolangdi Multipurpose Dam project is one of the largest project with biggest single loan from the world Bank, as well as a challenging project in the worldwide.

    小浪底水利枢纽中国利用世界银行贷款单项数额最大项目,它也是世界范围内具有挑战性的工程。

    youdao

  • The dam is important for the safety monitoring of Xiaolangdi Multipurpose dam Project because a lot of instruments and 8 collimating lines have been built inside the dam.

    小浪底大坝枢纽安全监测重要部位,埋设了大量内部观测仪器,布设了8条视准线

    youdao

  • The dam is important for the safety monitoring of Xiaolangdi Multipurpose dam Project because a lot of instruments and 8 collimating lines have been built inside the dam.

    小浪底大坝枢纽安全监测重要部位,埋设了大量内部观测仪器,布设了8条视准线

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定