• Xiaolangdi Dam project on the Yellow River is 154 meters high.

    黄河小小浪底大坝工程154

    youdao

  • Safety monitoring automation system in Xiaolangdi Project, built since dam construction period, is a larger scale one.

    小浪底工程安全监测自动化系统规模施工期就开始进行系统建设。

    youdao

  • The dam is important for the safety monitoring of Xiaolangdi Multipurpose dam Project because a lot of instruments and 8 collimating lines have been built inside the dam.

    小浪底大坝枢纽安全监测重要部位,埋设了大量内部观测仪器,布设了8条视准线

    youdao

  • The Xiaolangdi Multipurpose Dam project is one of the largest project with biggest single loan from the world Bank, as well as a challenging project in the worldwide.

    小浪底水利枢纽中国利用世界银行贷款单项数额最大项目,它也是世界范围内具有挑战性的工程。

    youdao

  • The infiltration protection wall of deepest of over 80 meters at Xiaolangdi dam is the key project to control infiltration in the sand and gravel layer at dam base.

    小浪底主坝防渗墙坝基砂砾石覆盖层渗流控制关键工程最深80多米

    youdao

  • The curtain grouting project for the dam of Xiaolangdi Multipurpose project is large in size, big in difficulty, complex in geological conditions and high in technical requirements.

    小浪底大坝帷幕灌浆工程规模难度地质条件复杂技术含量

    youdao

  • The curtain grouting project for the dam of Xiaolangdi Multipurpose project is large in size, big in difficulty, complex in geological conditions and high in technical requirements.