When compared with firefighters who did not work at ground zero, firefighters working the pile were 19% more likely to get a cancer diagnosis.
与未曾在座标零点工作过的消防员对比,在废墟上工作过的消防员诊断出患癌的机率高出19%。
"You obviously can't be afraid of heights," says Mr. Riegel, who once fell two stories while working on a rooftop in the rain but luckily landed safely on a pile of soft dirt.
“你肯定不能怕高”,Riegel说,他曾经在一个下雨天,从两层楼上跌下,但幸运是落入了一堆软土中。
Michael Valentin, who volunteers for the group, spent about four months working around the pile of debris from the towers.
该组织的志愿工作者迈克尔·瓦伦丁(Michael Valentin),在那一大堆残骸周围工作了大约4个月。
But when too many pile up, you feel rushed to complete a series of tasks, " said Liu, who attended two weddings in the past week, one of which she was also "working" as the bridesmaid.
刘小姐表示,她在过去的一周里参加了两次婚礼,其中一次她还是伴娘。
The career also benefits from a lack of competition, employer demand, rising wages and excellent working environments pushing it to the top of the pile.
而且,网页开发人员的竞争少,需求大、工资涨、工作环境好,这些优势都将这份工作推上了最好工作的宝座。
The CM composite foundation is a kind of new type composite ground based on working principle, cushion effect, stress-passing characteristic and stress analysis of the single pile foundation.
CM桩复合地基是在原有的单一桩复合地基的工作机理、垫层效应、传力特性、应力分析的基础上提出的一种新型复合地基。
The pile of low strength concrete (LC pile) has very extensive applied foreground because of its working principle AD economic factor.
低强度等级混凝土桩(LC桩)由于其工作原理及经济等因素,应用前景十分广泛。
The pile of low strength concrete(LC pile) has very extensive applied foreground because of its working principle and economic factor.
低标号混凝土桩(LC桩)由于其工作原理及经济等因素,应用前景十分广泛。
The self-Balanced method is a new technologies of foundation pile static load test, vertical compression pile is closer to the actual working conditions of a test method.
自平衡试桩法是一种基桩静载试验新技术,是接近于竖向抗压桩实际工作条件的一种试验方法。
In view of the effective working lengths of pile bodies in ground treatment, an analysis is carried out on the work mechanism of long and short piles.
基于桩体在地基处理中的有效工作长度对长短桩的工作机理进行了分析。
After pressure grouting on pile tip, elastic working range of piles will be extended and be in favour of pile to bear repeated loads and dynamic loads.
桩端压力灌浆后,桩的弹性工作范围延长,有利于桩承受重复荷载和动力荷载。
Composite pile foundation with long and short piles is a new kind of pile foundation. It is necessary to study the bearing mechanics and working behavior.
长短桩组合桩基础作为一种新型的桩基形式,对其承载性状、工作机理的研究很有必要。
To satisfy the needs of project design, it is necessary to study for calculation method and the working properties of pile foundation under reciprocating load role.
为了满足工程设计的需要,有必要对桩基在往复荷载作用下的工作性状和计算方法进行研究。
This article focuses on the design principle, working process and know-how of the stiffening pile.
本文重点介绍了劲性桩的设计原理,施工流程、工艺和方法。
So, it is necessary to analyze the main factors which effect the settlement and working mechanism of pile CFG's composite foundation.
因此有必要对影响沉降的主要因子以及CFG桩复合地基的工作机理进行分析。
Based upon the working principle of lime-rock pile, design and construction method of lime-rock pile reinforcing soft soil foundation, corresponding treatment measures to common problems are proposed.
介绍了灰石桩的成桩机理,阐述了灰石桩加固地基的设计及其施工方法,并对灰石桩加固软弱地基过程中常见的问题提出了相应的处理措施。
They're still working through that pile of papers.
他们还在努力处理完那堆文件。
It has become a theoretical and engineering concern at the summit, to study long-short-pile composite foundation working mechanism.
长短桩复合地基工作性状研究,已逐步成为理论和工程界关注的热点。
From the analysis of the engineering peculiarity of the salty soil, the working principle of the method of the complex foundation of dry jet mixing pile combined with geogrid is studied.
从分析盐渍土的工程特性入手,探讨桩-网复合基础处理盐渍土地基方法及其作用机理。
The improvement toward construction technology of CFG pile has prolonged its effective working time in low temperature environment which ensures the pile quality.
通过对CFG桩施工工艺的改进,延长其在低温环境下施工的有效作业时间,保证了成桩质量。
"People start working again," he said. "they have to catch up. Usually there is a big pile of work for them when they get back from the holiday."
“人们重新开始工作,”他说,“他们不得不赶上进度。”当他们度假回来上班时,通常有一大堆工作等着他们。
The characteristics of negative skin friction (NSF) with working load on pile top were analyzed.
分析了在桩顶荷载作用下的负摩阻力特性。
Berth in Dongdu Port Area of Xiamen Port, the paper expounds the working mechanism, method design and result of execution of underwater strap-on blasting method for demolition of the pile foundation.
通过对厦门东渡19号泊位桩基码头几种桩基拆除试验及工期成本分析,重点阐述了水下捆绑爆破法的工艺原理、方案设计及实施效果。
Sutong Bridge located in the tidal reach adopts the pile-group foundation with large-diameter and over-length bored piles working with the steel casing together.
位于潮汐河段的苏通大桥采用大直径、超长钻孔灌注群桩基础,而且需要考虑钢护筒的共同作用。
Sutong Bridge located in the tidal reach adopts the pile-group foundation with large-diameter and over-length bored piles working with the steel casing together.
位于潮汐河段的苏通大桥采用大直径、超长钻孔灌注群桩基础,而且需要考虑钢护筒的共同作用。
应用推荐