In the production process of Huopu Mine, advance mining method was temporarily adopted in local area due to the impact of underground water and geologic structure in front of the working face.
火铺矿采煤工作面生产过程中,由于工作面前方受水及地质构造等因素的影响而局部地段临时采用前进式推进的方法进行回采。
The influence of mining on the advance roadway of working face is analyzed with numerical simulation and the rational advance supporting method and parameters of working face are confirmed.
并通过计算机数值模拟及优化,分析了工作面预掘巷受采动影响的作用,确定了合理的工作面预掘巷支护方案与支护参数;
The mining procedures which have an influence on the stress field in the strata and the fracturing of the roof are the rate of daily face advance, the mining rhythm, and the nature of working.
对于覆岩应力场和覆岩破裂有影响的采矿因素是工作面推进速度、采矿周期性和顶板管理方法。
The mining procedures which have an influence on the stress field in the strata and the fracturing of the roof are the rate of daily face advance, the mining rhythm, and the nature of working.
对于覆岩应力场和覆岩破裂有影响的采矿因素是工作面推进速度、采矿周期性和顶板管理方法。
应用推荐