If the design contains a segment that has no wire load model, the tool traverses the design hierarchy upward until it finds a wire load model.
如果包含此网线段的设计没有定义线载模型,DC查找上一层次设计的线载模型,直到找到线载模型。
The simplified mechanics model was built based on analyzing load of wire rope tie-in, and then a suit of high efficient testing equipment on tie-in performance was set up according to ine model.
基于对电梯钢丝绳接头荷载的分析,建立了绳头承载简化力学模型,并依此设计出一套高效的绳头性能试验装置。
The simplified mechanics model was built based on analyzing load of wire rope tie-in, and then a suit of high efficient testing equipment on tie-in performance was set up according to ine model.
基于对电梯钢丝绳接头荷载的分析,建立了绳头承载简化力学模型,并依此设计出一套高效的绳头性能试验装置。
应用推荐