Horizontal holes were drilled into the wet soil and liquid nitrogen was pumped in, freezing the water until the tunnel could be dug and cemented.
在湿的土壤中水平的打一些洞,然后泵入液氮对水进行冷冻,直到隧道可以被挖掘和用水泥封住。
Horizontal holes were drilled into the wet soil and liquid nitrogen was pumped in, freezing the water until the tunnel could be dug and cemented.
在湿的土壤中水平的打一些洞,然后泵入液氮对水进行冷冻,直到隧道可以被挖掘和用水泥封住。
应用推荐