• Based on 3 factors of stud diameter and concrete intensity and steel fibre, orthogonal push-off tests of welded stud shear connectors were conducted.

    焊接圆柱头栓连接件,考虑栓钉直径混凝土强度纤维配置因素进行三因素三水平正交推出试验

    youdao

  • Based on 3 factors of stud diameter and concrete intensity and steel fibre, orthogonal push-off tests of welded stud shear connectors were conducted.

    焊接圆柱头栓连接件,考虑栓钉直径混凝土强度纤维配置因素进行三因素三水平正交推出试验

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定