Thus the problem is to make a decision on whether and when to start the breakdown so as to minimize the maximum completion time, the total completion time or the weighted total completion time.
因此问题就需要决定是否中断,以及何时中断,使得最大完工时间、完工时间总和、加权完工时间总和等尽可能小。
Minimize the total weighted completion time single machine scheduling problems.
最小化加权总完工时间的单机排序问题。
This paper discusses the stochastic scheduling on a single machine to minimize total weighted completion time subject to precedence constraints of chains.
研究具有链式约束的单机随机排序问题,目标函数为加权总完工时间的数学期望。
The paper studies the schedule problem of cross docking distribution in the situation of two machines, which objective function is the total weighted completion time.
主要研究两台机器环境下的以加权完工时间和为目标函数的越库调度问题。
The paper studies the schedule problem of cross docking distribution in the situation of two machines, which objective function is the total weighted completion time.
主要研究两台机器环境下的以加权完工时间和为目标函数的越库调度问题。
应用推荐