• Due to the weak surrounding rock, high ground stress. easy collapse and big deformation, the construction of tunnels with mudstone were very difficult.

    泥岩隧道围岩软弱,地应力强烈,坍塌变形修建困难

    youdao

  • The 346km long section from Ji'an to Guangdong boundary on Beijing-Jiulong Railway Line is in the cindition of weak ground soil and abundant rainfall, the construction is very difficult.

    京九铁路赣南吉安至赣省界地质不良,降雨量多,工程艰巨,加之设计方案定得晚,开工滞后,因此工期紧张的矛盾十分突出。

    youdao

  • The 346km long section from Ji'an to Guangdong boundary on Beijing-Jiulong Railway Line is in the cindition of weak ground soil and abundant rainfall, the construction is very difficult.

    京九铁路赣南吉安至赣省界地质不良,降雨量多,工程艰巨,加之设计方案定得晚,开工滞后,因此工期紧张的矛盾十分突出。

    youdao