Tepco said at first that the worker who took the measurement, of a pool of water in the reactor's basement turbine building, had fled before taking a second reading.
东电解释说,进行测量的技术人员没有进行第二次测量就吓得跑了出去,他的测量地点是反应堆地下室发电机组建筑里的一个水池。
In this paper, it is introduced to the influence of cavitation factor, measurement taps, sampling frequency and sampling time on the test result in pressure fluctuation test of the water turbine.
介绍了水轮机压力脉动试验时空化系数、测量位置及测点、信号采样频率及采样时间等因素对试验结果的影响。
Several measurement methods of water turbine runner cracks are introduced in this paper. The methods were applied to Xiaolangdi Hydropower Plant and satisfactory effect was obtained.
介绍了水轮机转轮裂纹的几种测试方法,并应用于小浪底水电站,取得了良好的效果。
Several measurement methods of water turbine runner cracks are introduced in this paper. The methods were applied to Xiaolangdi Hydropower Plant and satisfactory effect was obtained.
介绍了水轮机转轮裂纹的几种测试方法,并应用于小浪底水电站,取得了良好的效果。
应用推荐