It takes the designed constructed water resource engineering as a controller installed on natural systems, and accounts for time delay factors.
把设计修建的水资源工程视作安装于自然系统上的一个控制器,同时考虑当前状态量与时延量的制约关系。
It takes the designed constructed water resource engineering as a controller installed on natural systems, and accounts for time delay factors.
把设计修建的水资源工程视作安装于自然系统上的一个控制器,同时考虑当前状态量与时延量的制约关系。
应用推荐