GLLVHT model was applied to the simulation of temperature distribution of cooled water discharge of Jiangsu LNG project for the prediction of environmental influences.
采用GLLVHT模型对江苏LNG项目冷海水排放温度场进行模拟计算,预测其环境影响。
Water supply network is an ever-changing, changing the project, there is no final model.
供水管网是一项不断变迁、更改的工程,没有最终的模式。
Combining with the advanced water resource dispatch project of Yunnan Power Group, the ANN model is successfully applied to mid-long term forecast system of water resource.
结合云南电力集团水调高级自动化工程项目,将本文的人工神经网络模型应用到中长期水情预报软件系统中,取得了较好的效果。
In fact, besides resource price, project price, environment price, profit and revenue, the cost of institutional design and innovation is also a part of the full-cost water pricing model.
事实上,全成本水价除包括资源水价、工程水价、环境水价以及利润和税收外,还包括水价制度设计和变迁的成本。
Evaluation model of water pollution control project in region is constructed by using relation between fuzzy consistency matrix and its weights.
运用模糊一致性矩阵与其权重的关系构造了区域水污染控制方案的评价模型。
The results from two cases of model prediction in water environment show better prediction effect and are compared with the project pursuit regressive (PPR) model.
通过水环境中的两个实例进行了预测应用,结果表明,预测效果较好,并与投影寻踪回归模型(PPR)进行了对比。
The water turbine model test for Geheyan Project was performed in 1991, in Lachine, Quebee, Canada.
隔河岩水轮机模型试验1991年在加拿大魁北克拉辛市进行。
The regional water and salt balance model after improvement can describe the present situation of Hotan sub-project area and the simulation accuracy is better than before.
改进后的区域水盐平衡模型更为合理,更符合和田子项目区的实际情况,模拟精度也随之提高。
This model consists of water price of resource, water price of project and water price of environment.
该模型由资源水价、工程水价和环境水价构成。
Also, the supply chain model and the operation mode of the water resources allocation in east line of the Project of water Transferring from South to North are developed.
并分析了南水北调东线水资源配置与调度供应链的概念模型和运作模式。
Using hydraulic model, the writers studied the process and pattern of sediment deposit in high pressure water conveyance pipe of Wanjiazhai YRDP (Yellow River Diversion Project).
作者采用模型试验方法研究了万家寨引黄工程高压输水管道中泥沙的淤积过程、形态,分析了临界不淤流速及管道淤堵等问题。
As reference, some Suggestions are put forward for the model acceptance tests in the South-to-North Water Project to be similar with this pumping station.
同时,根据该试验验收过程提出了南水北调工程中泵站装置验收需要考虑的若干建议,供其它类似泵站试验验收参考。
The paper deal with characteristic of hydropower station reservoir system with transbasin-water-diversion project, and then, a model for optimal operation of the system is established.
在研究跨流域引水水电站水库系统特性的基础上,根据系统分析的理论和方法,建立具有跨流域引水工程的水电站水库系统优化调度模型。
Method to detect robot′s position and orientation is stu-died, and the control system project is discussed. Finally, the mechanics model that the robot works in water-mud environment is also founded.
研究了拱泥机器人的运动控制与位姿检测方案,并建立了拱泥机器人在水下泥土环境中作业的力学模型。
Method to detect robot′s position and orientation is stu-died, and the control system project is discussed. Finally, the mechanics model that the robot works in water-mud environment is also founded.
研究了拱泥机器人的运动控制与位姿检测方案,并建立了拱泥机器人在水下泥土环境中作业的力学模型。
应用推荐