Finally, the optimization measures for the cooling water intake-outlet project of power plant are investigated and some new ideas are put forward.
最后对电厂取排水问题的优化措施及性能进行分析,提出若干新的见解。
If there exists shelter embankment at the water intake area of a power plant, the back silting at the place of intake and intake canal etc.
电厂取水口建掩护堤后,取水口、取水渠等处的回淤必须在电厂建设之前予以解决。
The testing scheme and testing method of water intake and outlet model for one power plant have been presented.
介绍某电厂取排水口模型试验方案和试验方法。
If there exists shelter embankment at the water intake area of a power plant, the back silting at the place of intake and intake canal etc. must be solved before the construction of the power plant.
电厂取水口建掩护堤后,取水口、取水渠等处的回淤必须在电厂建设之前予以解决。
The water intake and outlet of power plant in tidal river bend is researched by model test with adopting w shaped rippled groove which meets the request of model roughness.
摘要进行了潮汐弯道段电厂取排水模型试验,采用w形波纹凹槽方式加糙,使模型糙率达到了模型试验的要求。
The water intake and outlet of power plant in tidal river bend is researched by model test with adopting w shaped rippled groove which meets the request of model roughness.
摘要进行了潮汐弯道段电厂取排水模型试验,采用w形波纹凹槽方式加糙,使模型糙率达到了模型试验的要求。