Before feeding water, air vent valves, pressure gauge valve, water level gauge, burner supply valve and steam supply valve should be opened fully. Other valves and checking manhole close.
上水时,空气阀、压力表阀及水位计通汽通水阀开足,其他阀门和检查门无孔门应一律关闭。
In front of the feed water regulator, split, economizer, superheater export, between superheater outlet and main steam valve, to heat the import and export, all should be installed pressure gauge.
在给水调节阀前、可分式省煤器出口、过热器出口、过热器出口与主汽阀之间,再热气进出口、都应装设压力表。
1 before the fire, steam boiler, should check the valve pipe, steam pipe, pressure gauge, safety valve, water level gauge, drain valve is in good condition.
蒸汽锅炉生火之前,应检查各阀门水管、汽管、压力表、安全阀、水位表、排污阀等是否处在完好状态。
1 before the fire, steam boiler, should check the valve pipe, steam pipe, pressure gauge, safety valve, water level gauge, drain valve is in good condition.
蒸汽锅炉生火之前,应检查各阀门水管、汽管、压力表、安全阀、水位表、排污阀等是否处在完好状态。