It is one of the important research projects in the field of controlling water-inrush from roof that the calculating method of water flowing fracture height caused by coal mining.
煤层开采所引发的上覆岩层导水断裂带高度的计算方法是矿井顶板水害防治中的重要研究课题之一。
Theoretical analysis, simulation experiment and engineering exploration are adopted to study the impact of the location of primary key stratum on the evolution range of water flowing fracture.
采用理论分析、模拟实验和工程探测等方法,就覆岩主关键层位置对导水裂隙带高度的影响进行深入研究。
Theoretical analysis, simulation experiment and engineering exploration are adopted to study the impact of the location of primary key stratum on the evolution range of water flowing fracture.
采用理论分析、模拟实验和工程探测等方法,就覆岩主关键层位置对导水裂隙带高度的影响进行深入研究。
应用推荐