• The hydrogeologic conditions of Anqing copper mine are analyzed herein based on data of pit water gushing and observation of groundwater level.

    本文利用矿坑突(资料及矿区地下水位观测资料对安庆铜矿水文地质条件进行分析概化。

    youdao

  • When the system is confined well, the change of observation water level has a linear relation with water head change.

    系统封闭很好的情况下,观测水位变化基本水头的变化线性关系

    youdao

  • In water level, analog observation and digital observation are difference in nature. Two kinds of data are consistent in trend and natural quality but different in stability and accuracy.

    水位数字化模拟观测,因其观测的原理存在差异,虽然二者的趋势变化一致内在质量相当,其精度和稳定性却存在较大差异

    youdao

  • The factors of influences precision of observation data are mainly instrument failure, water level, atmospheric pressure and air temperature.

    影响观测资料精度主要因素仪器故障水位气压气温等;

    youdao

  • Using observation data of underground water level proves to be a comparatively reliable method for inversion analysis of seepage parameters for fractured rocks.

    利用地下水位观测资料岩体渗透参数进行反演较为可靠方法

    youdao

  • Due to the lack of the actual observation data about the groundwater water level and the surface subsidence, it is difficult to carry on careful researches.

    由于缺少地下水水位地面沉降实际观测资料难以进行细致的研究。

    youdao

  • The column type container is made from transparent or non-transparent materials but the external wall is provided with a water level observation window or a water level tube.

    容器透明材料制成或是用不透明材料制成,设有水位观察水位

    youdao

  • YLN-SMT-HART/SDI12 is mainly used for the inputting type water level transmitter hydrological observation wells or inconvenience built costly.

    SDI12投入液位变送器主要用于水文站水位观测点不便建井费用昂贵的地区。

    youdao

  • The causes of the higher-than-normal water levels of foundation seepage observation holes, and the synchronous water level variation with the upstream reservoir level are analyzed.

    坝基渗流观测孔孔水位普遍偏高、且上游水位变化基本同步的异常性进行了物理成因解析。

    youdao

  • Combined with analysis on observation data and relation between seepage and water level, as well as seepage regression analysis and finite element method, the paper studied dam seepage, for reference.

    本文通过大坝观测资料渗水量水位关系渗水量回归分析,利用有限元方法,对大坝渗透破坏现象进行初步分析运行管理提供参考

    youdao

  • It gives supports to the relevant results obtained by other kind of observation, and demonstrated that there are plenty geophysical information contained in the water level data of the deep boreholes.

    这是对以往其它观测手段得到相应结果支持同时也说明了深井水位资料含有非常丰富地球物理信息

    youdao

  • Continuous water level data are published for 7 observation Wells and measured at 60 additional Wells.

    持续水平面测量数字7个观测公布的,由另外的60个井测得。

    youdao

  • The hydrogeologic conditions of Anqing copper mine are analyzed herein based on data of pit water gushing and observation of groundwater level.

    参考大量资料基础针对安庆铜矿深部大直径法开采的稳定性进行研究。

    youdao

  • The hydrogeologic conditions of Anqing copper mine are analyzed herein based on data of pit water gushing and observation of groundwater level.

    参考大量资料基础针对安庆铜矿深部大直径法开采的稳定性进行研究。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定